Talybont
TLBWalesManaged by TfW Rail
How this station is performing
Talybont has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,356 scheduled stops, about 15 a day. In those periods 80.8% of stops arrived within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Talybont opened on 1 July 1912, 114 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Dyffryn Ardudwy is the oldest (1867) and Llanbedr the newest (1923), with Talybont in between.
The nearest stations to Talybont are Dyffryn Ardudwy (1.8 km north), Llanaber (3.8 km south), Llanbedr (5.3 km north), Barmouth (6.2 km south-east) and Pensarn (Gwynedd) (6.5 km north). 9 stations lie within 10 km in all. Of the five, Barmouth is the most punctual at 81.9% and Llanbedr the least at 79.7%, with Talybont on 80.8%.
Talybont is one of 2 stations named after a Village called Talybont; this one stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Talybont was Period 5 of 2025-26, at 55.4%, some time before the latest year. The strongest was Period 12 of 2023-24, at 93.5%, and the two are 38.1 percentage points apart.
1 of 3 stations of a similar size in Wales are more punctual than Talybont on 80.8%. The comparison group includes Dyffryn Ardudwy (80.4%), Fairbourne (80.7%) and Harlech (82.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,356 | 80.8% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Talybont? Delay Repay
These operators call at Talybont and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 85.3% | 0.7% |
| Period 6 of 2026-27 | 430 | 71.2% | 1.4% |
| Period 5 of 2026-27 | 427 | 58.7% | 2.8% |
| Period 4 of 2026-27 | 426 | – | 2.1% |
| Period 3 of 2026-27 | 424 | 74.2% | 2.6% |
| Period 2 of 2026-27 | 357 | 77.6% | 0.0% |
| Period 1 of 2026-27 | 487 | 83.9% | 1.0% |
| Period 13 of 2025-26 | 466 | 85.0% | 0.2% |
| Period 12 of 2025-26 | 288 | 90.9% | 0.3% |
| Period 11 of 2025-26 | 392 | 91.1% | 1.3% |
| Period 10 of 2025-26 | 387 | 86.0% | 2.8% |
| Period 9 of 2025-26 | 424 | 86.1% | 1.4% |
| Period 8 of 2025-26 | 424 | 76.4% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dyffryn Ardudwy | 5,356 | 80.4% | 1.4% |
| Fairbourne | 5,356 | 80.7% | 1.4% |
| Harlech | 5,356 | 82.1% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out