Harlech
HRLWalesManaged by TfW Rail
How this station is performing
Harlech had 5,356 scheduled stops to Period 7 of 2026-27, about 15 a day. 82.1% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Harlech opened on 10 October 1867, 159 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Harlech is the oldest; the next oldest, Pensarn (Gwynedd), dates from 1867.
The nearest stations to Harlech are Llandanwg (3.0 km south), Pensarn (Gwynedd) (3.4 km south), Tygwyn (4.2 km north-east), Llanbedr (4.6 km south) and Talsarnau (5.5 km north-east). 11 stations lie within 10 km in all. At 82.1%, Harlech is more punctual than every one of them; the best of the five, Llanbedr, manages 79.7%.
Across the whole run of data, the weakest four-week period for Harlech was Period 5 of 2024-25, at 63.2%, some time before the latest year. The strongest was Period 11 of 2025-26, at 93.8%, and the two are 30.6 percentage points apart.
Compared with 3 stations of a similar size in Wales, Harlech is the most punctual, at 82.1%. The comparison group includes Dyffryn Ardudwy (80.4%), Fairbourne (80.7%) and Llanbedr (79.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,356 | 82.1% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Harlech? Delay Repay
These operators call at Harlech and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 87.4% | 0.7% |
| Period 6 of 2026-27 | 430 | 77.6% | 1.4% |
| Period 5 of 2026-27 | 427 | 69.2% | 2.8% |
| Period 4 of 2026-27 | 426 | 70.0% | 2.1% |
| Period 3 of 2026-27 | 424 | 78.2% | 2.6% |
| Period 2 of 2026-27 | 357 | 76.2% | 0.0% |
| Period 1 of 2026-27 | 487 | 85.7% | 1.0% |
| Period 13 of 2025-26 | 466 | 85.4% | 0.2% |
| Period 12 of 2025-26 | 288 | 92.7% | 0.3% |
| Period 11 of 2025-26 | 392 | 93.8% | 1.3% |
| Period 10 of 2025-26 | 387 | 88.1% | 2.1% |
| Period 9 of 2025-26 | 424 | 86.6% | 1.4% |
| Period 8 of 2025-26 | 424 | 79.8% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dyffryn Ardudwy | 5,356 | 80.4% | 1.4% |
| Fairbourne | 5,356 | 80.7% | 1.4% |
| Llanbedr | 5,356 | 79.7% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out