GTR at Sydenham (London)
How this operator is doing here
GTR had 26,868 scheduled stops at Sydenham (London) in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 91.9% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
GTR trains at Sydenham (London) also serve Penge West (1.2 km south, 86.2% on time, 4.7% cancelled), Forest Hill (1.2 km north, 91.7% on time, 3.8% cancelled), Crystal Palace (1.6 km south-west, 93.6% on time, 2.8% cancelled), Anerley (1.9 km south-west, 87.2% on time, 4.7% cancelled), Gipsy Hill (2.1 km west, 95.4% on time, 2.8% cancelled) and Bellingham (2.5 km east, 89.4% on time, 4.0% cancelled), which are the stations on its network closest to Sydenham (London).
Within 30 km of here, GTR runs best at Birkbeck, 2.7 km south (98.1%), and worst at Kenley, 11.9 km south (66.9%).
The busiest GTR station within 30 km of Sydenham (London) is East Croydon, 6.4 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Sydenham (London), GTR is the most punctual, at 91.9%.
GTR at Sydenham (London) has slipped a little, from 94.5% within three minutes in the previous 13 periods to 91.9% in the latest 13, a fall of 2.6 percentage points. Cancellations rose to 3.7% of scheduled stops from 1.8%, which is 1.9 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,084 | 89.2% | 6.9% |
| Period 6 of 2026-27 | 2,045 | 83.9% | 2.2% |
| Period 5 of 2026-27 | 2,045 | 86.7% | 4.9% |
| Period 4 of 2026-27 | 2,207 | 93.3% | 3.0% |
| Period 3 of 2026-27 | 2,123 | 92.9% | 2.3% |
| Period 2 of 2026-27 | 1,994 | 95.1% | 3.2% |
| Period 1 of 2026-27 | 2,317 | 94.4% | 4.6% |
| Period 13 of 2025-26 | 2,317 | 94.5% | 3.2% |
| Period 12 of 2025-26 | 2,022 | 93.1% | 4.3% |
| Period 11 of 2025-26 | 1,801 | 91.6% | 3.0% |
| Period 10 of 2025-26 | 1,960 | 93.5% | 2.6% |
| Period 9 of 2025-26 | 1,977 | 92.7% | 1.7% |
| Period 8 of 2025-26 | 1,976 | 93.1% | 6.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sydenham (London)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 103,361 | 91.6% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out