Southeastern at Sydenham Hill
All trains at Sydenham HillSoutheastern across BritainLondon
How this operator is doing here
Southeastern had 44,737 scheduled stops at Sydenham Hill in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 83.9% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Southeastern trains at Sydenham Hill also serve West Dulwich (1.1 km north-west, 81.3% on time, 2.6% cancelled), Penge East (2.3 km south-east, 84.5% on time, 2.6% cancelled), Herne Hill (2.8 km north-west, 80.8% on time, 2.4% cancelled), Kent House (3.3 km south-east, 85.3% on time, 2.5% cancelled), Lower Sydenham (3.3 km east, 93.7% on time, 1.2% cancelled) and New Beckenham (3.5 km south-east, 93.5% on time, 1.1% cancelled), which are the stations on its network closest to Sydenham Hill.
Within 30 km of here, Southeastern runs best at Sundridge Park, 7.3 km east (99.4%), and worst at Sevenoaks, 25.2 km south-east (72.3%).
The busiest Southeastern station within 30 km of Sydenham Hill is London Bridge, 8.1 km north, with about 912 scheduled stops a day.
Of the 1 operators with enough records at Sydenham Hill, Southeastern is the most punctual, at 83.9%.
Southeastern at Sydenham Hill has not moved in one direction over three full railway years: 79.2% within three minutes in 2023-24, 86.0% in 2024-25 and 85.2% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,532 | 83.8% | 1.8% |
| Period 6 of 2026-27 | 3,616 | 83.0% | 2.8% |
| Period 5 of 2026-27 | 2,560 | 74.9% | 2.7% |
| Period 4 of 2026-27 | 3,705 | 87.5% | 2.5% |
| Period 3 of 2026-27 | 3,666 | 82.6% | 4.1% |
| Period 2 of 2026-27 | 3,526 | 85.9% | 3.6% |
| Period 1 of 2026-27 | 4,028 | 91.7% | 1.5% |
| Period 13 of 2025-26 | 4,013 | 90.0% | 1.4% |
| Period 12 of 2025-26 | 3,671 | 86.5% | 1.7% |
| Period 11 of 2025-26 | 3,708 | 86.4% | 1.6% |
| Period 10 of 2025-26 | 2,267 | 78.9% | 4.7% |
| Period 9 of 2025-26 | 3,132 | 76.3% | 3.1% |
| Period 8 of 2025-26 | 3,313 | 75.4% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out