Swinderby
SWDEast MidlandsManaged by East Midlands Railway
How this station is performing
Swinderby had 11,698 scheduled stops to Period 7 of 2026-27, about 32 a day. 88.3% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Swinderby opened on 1 May 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Collingham is the oldest (1846) and Newark Northgate the newest (1852), with Swinderby in between.
The nearest stations to Swinderby are Collingham (4.2 km south-west), Hykeham (7.4 km north-east), Saxilby (11.2 km north), Newark Northgate (11.7 km south-west) and Newark Castle (12.4 km south-west). 2 stations lie within 10 km in all. At 88.3%, Swinderby is more punctual than every one of them; the best of the five, Newark Castle, manages 85.1%.
Swinderby takes its name from a Village called Swinderby, home to about 798 people, and the station stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Swinderby was Period 9 of 2023-24, at 69.2%, some time before the latest year. The strongest was Period 11 of 2025-26, at 92.1%, and the two are 22.9 percentage points apart. Cancellations peaked at 5.5% of scheduled stops in Period 12 of 2023-24, against 2.1% over the latest 13 periods.
Compared with 3 stations of a similar size in East Midlands, Swinderby is the most punctual, at 88.3%. The comparison group includes Boston (72.2%), Bamford (68.0%) and Hathersage (68.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 11,698 | 88.3% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Swinderby? Delay Repay
These operators call at Swinderby and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 948 | 86.0% | 1.4% |
| Period 6 of 2026-27 | 943 | 87.8% | 1.7% |
| Period 5 of 2026-27 | 944 | 86.8% | 2.6% |
| Period 4 of 2026-27 | 948 | 88.6% | 2.5% |
| Period 3 of 2026-27 | 938 | 85.5% | 2.9% |
| Period 2 of 2026-27 | 945 | 87.1% | 2.9% |
| Period 1 of 2026-27 | 1,089 | 91.3% | 0.7% |
| Period 13 of 2025-26 | 1,040 | 91.0% | 2.2% |
| Period 12 of 2025-26 | 943 | 90.7% | 2.0% |
| Period 11 of 2025-26 | 936 | 92.1% | 2.5% |
| Period 10 of 2025-26 | 891 | 89.4% | 1.6% |
| Period 9 of 2025-26 | 461 | 81.2% | 3.0% |
| Period 8 of 2025-26 | 672 | 84.4% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Boston | 11,671 | 72.2% | 2.4% |
| Bamford | 11,929 | 68.0% | 1.9% |
| Hathersage | 12,034 | 68.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out