Sway
SWYSouth EastManaged by South Western Railway
How this station is performing
Sway had 16,530 scheduled stops to Period 7 of 2026-27, about 45 a day. 72.0% of recorded arrivals were within three minutes of the timetable and 6.4% of scheduled stops were cancelled.
Sway opened on 6 March 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sway is the newest; the oldest, Brockenhurst, opened in 1847.
The nearest stations to Sway are Brockenhurst (4.4 km north-east), New Milton (4.7 km south-west), Lymington Town (5.7 km south-east), Lymington Pier (6.4 km south-east) and Hinton Admiral (8.1 km south-west). 5 stations lie within 10 km in all. At 72.0%, Sway is less punctual than all of them; the best of the five, Lymington Town, manages 97.4%.
Sway takes its name from a Village called Sway, home to about 3,478 people, and the station stands 0.7 km from its centre.
Sway has slipped sharply. 72.0% of stops came within three minutes of the timetable in the latest 13 periods, 6.3 percentage points worse than the 78.3% recorded in the 13 before. Cancellations rose to 6.4% of scheduled stops from 4.0%, which is 2.4 percentage points more.
Compared with 3 stations of a similar size in South East, Sway is the least punctual, at 72.0%. All of them are ahead, including Hinton Admiral (72.3%), Farningham Road (85.1%) and Ryde Esplanade (98.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 16,530 | 72.0% | 6.4% |
Operators with their own page for this station are linked to it.
Late train at Sway? Delay Repay
These operators call at Sway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,219 | 59.5% | 4.8% |
| Period 6 of 2026-27 | 1,279 | 72.3% | 3.4% |
| Period 5 of 2026-27 | 1,293 | 61.0% | 6.0% |
| Period 4 of 2026-27 | 1,294 | 62.6% | 6.6% |
| Period 3 of 2026-27 | 1,214 | 72.9% | 8.7% |
| Period 2 of 2026-27 | 1,285 | 71.5% | 10.1% |
| Period 1 of 2026-27 | 1,446 | 84.0% | 3.0% |
| Period 13 of 2025-26 | 1,434 | 81.7% | 7.0% |
| Period 12 of 2025-26 | 1,188 | 81.8% | 7.9% |
| Period 11 of 2025-26 | 1,294 | 82.3% | 8.3% |
| Period 10 of 2025-26 | 1,097 | 79.8% | 4.1% |
| Period 9 of 2025-26 | 1,298 | 61.4% | 7.2% |
| Period 8 of 2025-26 | 1,189 | 63.2% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hinton Admiral | 16,530 | 72.3% | 6.4% |
| Farningham Road | 16,524 | 85.1% | 1.6% |
| Ryde Esplanade | 16,505 | 98.5% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out