Sunbury
SUUSouth EastManaged by South Western Railway
How this station is performing
Sunbury had 26,590 scheduled stops to Period 7 of 2026-27, about 73 a day. 86.5% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Sunbury opened on 1 November 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Feltham is the oldest (1848) and Upper Halliford the newest (1944), with Sunbury in between.
The nearest stations to Sunbury are Kempton Park Racecourse (0.6 km north-east), Upper Halliford (1.1 km south-west), Shepperton (3.2 km south-west), Hampton (London) (3.2 km east) and Feltham (3.3 km north). 40 stations lie within 10 km in all. Of the five, Feltham is the most punctual at 89.8% and Kempton Park Racecourse the least at 85.8%, with Sunbury on 86.5%.
Sunbury is named after Sunbury-on-Thames, a town, home to about 18,041 people, but the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Sunbury was Period 9 of 2024-25, at 59.7%, some time before the latest year. The strongest was Period 5 of 2023-24, at 96.4%, and the two are 36.7 percentage points apart. Cancellations peaked at 11.2% of scheduled stops in Period 3 of 2026-27, against 4.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Sunbury is the most punctual, at 86.5%. The comparison group includes Dunton Green (81.6%), Newhaven Town (86.4%) and Longfield (78.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 26,590 | 86.5% | 4.8% |
Operators with their own page for this station are linked to it.
Late train at Sunbury? Delay Repay
These operators call at Sunbury and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,026 | 91.8% | 2.9% |
| Period 6 of 2026-27 | 2,047 | 90.2% | 2.9% |
| Period 5 of 2026-27 | 2,052 | 89.1% | 2.8% |
| Period 4 of 2026-27 | 1,949 | 89.0% | 2.9% |
| Period 3 of 2026-27 | 1,995 | 87.1% | 11.2% |
| Period 2 of 2026-27 | 2,034 | 82.1% | 6.1% |
| Period 1 of 2026-27 | 2,355 | 90.4% | 3.5% |
| Period 13 of 2025-26 | 2,255 | 90.9% | 2.4% |
| Period 12 of 2025-26 | 1,941 | 77.7% | 5.8% |
| Period 11 of 2025-26 | 2,056 | 87.2% | 4.0% |
| Period 10 of 2025-26 | 1,795 | 86.7% | 5.7% |
| Period 9 of 2025-26 | 2,059 | 78.8% | 4.3% |
| Period 8 of 2025-26 | 2,026 | 81.4% | 8.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dunton Green | 26,649 | 81.6% | 1.4% |
| Newhaven Town | 26,752 | 86.4% | 1.5% |
| Longfield | 26,346 | 78.6% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out