West Midlands Railway at Stourbridge Junction
All trains at Stourbridge JunctionWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 112,219 scheduled stops at Stourbridge Junction in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 95.3% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
West Midlands Railway trains at Stourbridge Junction also serve Stourbridge Town (1.0 km north-west, 100.0% on time, 1.1% cancelled), Lye (West Midlands) (1.8 km north-east, 88.3% on time, 3.6% cancelled), Hagley (2.9 km south, 87.5% on time, 3.5% cancelled), Cradley Heath (3.8 km north-east, 88.2% on time, 3.6% cancelled), Blakedown (5.4 km south-west, 86.4% on time, 3.5% cancelled) and Old Hill (5.9 km north-east, 88.9% on time, 3.7% cancelled), which are the stations on its network closest to Stourbridge Junction.
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 1.0 km north-west (100.0%), and worst at Hampton-in-Arden, 29.5 km east (67.2%).
The busiest West Midlands Railway station within 30 km of Stourbridge Junction is Birmingham New Street, 16.3 km east, with about 532 scheduled stops a day.
Of the 2 operators with enough records at Stourbridge Junction, West Midlands Railway is the most punctual, at 95.3%.
For West Midlands Railway, Stourbridge Junction is the 8th best of 169 ranked stations. Its 95.3% here is 14.2 percentage points above the 81.1% across the whole network.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,744 | 94.7% | 0.8% |
| Period 6 of 2026-27 | 8,744 | 94.3% | 1.0% |
| Period 5 of 2026-27 | 7,614 | 94.2% | 3.7% |
| Period 4 of 2026-27 | 8,070 | 94.3% | 2.3% |
| Period 3 of 2026-27 | 8,399 | 95.5% | 2.3% |
| Period 2 of 2026-27 | 8,414 | 95.2% | 4.5% |
| Period 1 of 2026-27 | 10,111 | 96.6% | 1.2% |
| Period 13 of 2025-26 | 9,563 | 96.7% | 2.5% |
| Period 12 of 2025-26 | 8,744 | 96.9% | 0.7% |
| Period 11 of 2025-26 | 8,445 | 96.7% | 1.8% |
| Period 10 of 2025-26 | 7,886 | 94.9% | 1.7% |
| Period 9 of 2025-26 | 8,743 | 93.9% | 2.1% |
| Period 8 of 2025-26 | 8,742 | 94.9% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stourbridge Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 1,338 | 84.1% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out