West Midlands Railway at Stone (Staffs)
All trains at Stone (Staffs)West Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 12,125 scheduled stops at Stone (Staffs) in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 67.0% of recorded arrivals came within three minutes and 4.2% of stops were cancelled.
West Midlands Railway trains at Stone (Staffs) also serve Stoke-on-Trent (11.2 km north, 65.9% on time, 4.2% cancelled), Stafford (11.8 km south, 59.6% on time, 4.0% cancelled), Longport (15.4 km north, 61.8% on time, 4.1% cancelled), Penkridge (20.7 km south, 57.1% on time, 3.3% cancelled), Kidsgrove (20.7 km north, 70.4% on time, 4.1% cancelled) and Rugeley Trent Valley (21.6 km south-east, 77.6% on time, 4.7% cancelled), which are the stations on its network closest to Stone (Staffs).
Within 30 km of here, West Midlands Railway runs best at Rugeley Town, 22.5 km south-east (94.3%), and worst at Penkridge, 20.7 km south (57.1%).
The busiest West Midlands Railway station within 30 km of Stone (Staffs) is Crewe, 27.4 km north-west, with about 128 scheduled stops a day.
West Midlands Railway at Stone (Staffs) has slipped sharply. 67.0% of stops came within three minutes of the timetable in the latest 13 periods, 11.0 percentage points worse than the 78.0% recorded in the 13 before. Cancellations rose to 4.2% of scheduled stops from 3.2%, which is 1.0 percentage points more.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 932 | 64.1% | 0.8% |
| Period 6 of 2026-27 | 932 | 61.1% | 2.9% |
| Period 5 of 2026-27 | 932 | 64.8% | 2.8% |
| Period 4 of 2026-27 | 865 | 60.0% | 7.1% |
| Period 3 of 2026-27 | 927 | 63.0% | 3.5% |
| Period 2 of 2026-27 | 864 | 65.9% | 3.1% |
| Period 1 of 2026-27 | 1,069 | 72.8% | 0.8% |
| Period 13 of 2025-26 | 1,028 | 71.3% | 2.0% |
| Period 12 of 2025-26 | 932 | 66.3% | 1.6% |
| Period 11 of 2025-26 | 932 | 73.0% | 11.3% |
| Period 10 of 2025-26 | 849 | 68.5% | 5.4% |
| Period 9 of 2025-26 | 931 | 65.3% | 12.0% |
| Period 8 of 2025-26 | 932 | 73.2% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out