East Midlands Railway at Stockport
All trains at StockportEast Midlands Railway across BritainNorth West
How this operator is doing here
East Midlands Railway had 10,215 scheduled stops at Stockport in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 53.9% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
East Midlands Railway trains at Stockport also serve Hazel Grove (4.1 km south-east, – on time, – cancelled), Manchester Piccadilly (9.1 km north-west, 47.7% on time, 4.7% cancelled), Manchester Oxford Road (9.3 km north-west, 44.8% on time, 4.9% cancelled), Chinley (16.2 km south-east, 50.0% on time, 3.1% cancelled), Edale (23.4 km east, 56.0% on time, 2.2% cancelled) and Birchwood (24.0 km west, 68.6% on time, 6.9% cancelled), which are the stations on its network closest to Stockport.
Within 30 km of here, East Midlands Railway runs best at Warrington Central, 28.5 km west (62.0%), and worst at Manchester Oxford Road, 9.3 km north-west (44.8%).
The busiest East Midlands Railway station within 30 km of Stockport is Manchester Piccadilly, 9.1 km north-west, with about 29 scheduled stops a day.
East Midlands Railway at Stockport has slipped sharply. 53.9% of stops came within three minutes of the timetable in the latest 13 periods, 9.0 percentage points worse than the 62.9% recorded in the 13 before. Cancellations rose to 4.7% of scheduled stops from 3.9%, which is 0.8 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 820 | 49.3% | 2.6% |
| Period 6 of 2026-27 | 824 | 48.0% | 3.8% |
| Period 5 of 2026-27 | 763 | 51.1% | 8.8% |
| Period 4 of 2026-27 | 743 | 50.6% | 5.2% |
| Period 3 of 2026-27 | 824 | 47.5% | 7.9% |
| Period 2 of 2026-27 | 818 | 52.1% | 4.0% |
| Period 1 of 2026-27 | 946 | 60.1% | 6.2% |
| Period 13 of 2025-26 | 772 | 55.4% | 1.9% |
| Period 12 of 2025-26 | 562 | 59.5% | 2.1% |
| Period 11 of 2025-26 | 782 | 67.4% | 4.0% |
| Period 10 of 2025-26 | 755 | 55.1% | 6.0% |
| Period 9 of 2025-26 | 794 | 50.3% | 4.3% |
| Period 8 of 2025-26 | 812 | 55.5% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stockport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 70,202 | 81.6% | 2.4% |
| Avanti | 31,676 | 54.2% | 6.0% |
| CrossCountry | 20,547 | 60.1% | 6.8% |
| TransPennine Express | 12,093 | 61.2% | 2.8% |
| Transport for Wales | 11,585 | 68.6% | 6.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out