Stockport
SPTNorth WestManaged by Avanti West Coast
How this station is performing
Stockport had 156,318 scheduled stops to Period 7 of 2026-27, about 429 a day. 69.1% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Stockport opened on 15 February 1843, 183 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Stockport is the oldest; the next oldest, Heaton Chapel, dates from 1852.
The nearest stations to Stockport are Davenport (1.8 km south-east), Heaton Chapel (2.5 km north-west), Woodsmoor (2.6 km south-east), Reddish South (3.4 km north) and Brinnington (3.5 km north-east). 46 stations lie within 10 km in all. At 69.1%, Stockport is less punctual than all of them; the best of the five, Brinnington, manages 86.8%.
Stockport takes its name from a market town called Stockport, home to about 294,773 people, and the station stands 1.0 km from its centre.
6 operators call at Stockport: Northern (81.6%, 45% of stops), Avanti (54.2%, 20% of stops), CrossCountry (60.1%, 13% of stops), TransPennine Express (61.2%, 8% of stops) and Transport for Wales (68.6%, 7% of stops). The operator you travel with matters: Northern reaches 81.6% within three minutes while East Midlands Railway manages 53.9%, a gap of 27.7 percentage points.
2 of 3 stations of a similar size in North West are more punctual than Stockport on 69.1%. The comparison group includes Birkenhead Hamilton Square (89.4%), Liverpool James Street (90.3%) and Crewe (67.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 70,202 | 81.6% | 2.4% |
| Avanti | 31,676 | 54.2% | 6.0% |
| CrossCountry | 20,547 | 60.1% | 6.8% |
| TransPennine Express | 12,093 | 61.2% | 2.8% |
| Transport for Wales | 11,585 | 68.6% | 6.0% |
| East Midlands Railway | 10,215 | 53.9% | 4.7% |
Operators with their own page for this station are linked to it.
Late train at Stockport? Delay Repay
These operators call at Stockport and publish Delay Repay rules.
- Avanti: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- TransPennine Express: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Transport for Wales: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- East Midlands Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,991 | 68.4% | 3.2% |
| Period 6 of 2026-27 | 12,156 | 68.0% | 2.9% |
| Period 5 of 2026-27 | 11,883 | 67.0% | 4.8% |
| Period 4 of 2026-27 | 11,949 | 65.2% | 5.3% |
| Period 3 of 2026-27 | 11,692 | 67.2% | 3.6% |
| Period 2 of 2026-27 | 12,067 | 68.5% | 4.0% |
| Period 1 of 2026-27 | 13,543 | 73.2% | 6.0% |
| Period 13 of 2025-26 | 13,109 | 75.4% | 3.2% |
| Period 12 of 2025-26 | 10,644 | 73.1% | 2.5% |
| Period 11 of 2025-26 | 12,008 | 73.5% | 4.7% |
| Period 10 of 2025-26 | 10,904 | 70.7% | 4.9% |
| Period 9 of 2025-26 | 12,198 | 60.1% | 5.4% |
| Period 8 of 2025-26 | 12,174 | 66.9% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birkenhead Hamilton Square | 149,192 | 89.4% | 2.0% |
| Liverpool James Street | 149,190 | 90.3% | 2.1% |
| Crewe | 164,240 | 67.7% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out