CrossCountry at Stamford (Lincs)
All trains at Stamford (Lincs)CrossCountry across BritainEast Midlands
How this operator is doing here
CrossCountry had 11,454 scheduled stops at Stamford (Lincs) in the 13 periods to Period 7 of 2026-27, 93% of the station's total. 61.4% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
CrossCountry trains at Stamford (Lincs) also serve Oakham (17.3 km west, 59.0% on time, 3.3% cancelled), Peterborough (17.5 km south-east, 56.7% on time, 3.2% cancelled), Whittlesea (26.8 km south-east, 66.6% on time, 3.8% cancelled), Melton Mowbray (30.1 km north-west, 63.9% on time, 3.3% cancelled), March (39.8 km east, 65.0% on time, 3.4% cancelled) and Leicester (43.5 km west, 68.5% on time, 3.0% cancelled), which are the stations on its network closest to Stamford (Lincs).
The busiest CrossCountry station within 30 km of Stamford (Lincs) is Peterborough, 17.5 km south-east, with about 32 scheduled stops a day.
Of the 1 operators with enough records at Stamford (Lincs), CrossCountry is the most punctual, at 61.4%.
For CrossCountry, Stamford (Lincs) is the 55th best of 99 ranked stations. Its 61.4% here is 1.8 percentage points below the 63.2% across the whole network.
CrossCountry at Stamford (Lincs) has slipped sharply. 61.4% of stops came within three minutes of the timetable in the latest 13 periods, 5.1 percentage points worse than the 66.5% recorded in the 13 before. Cancellations fell to 3.3% of scheduled stops from 4.5%, which is 1.2 percentage points fewer.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 817 | 42.1% | 3.1% |
| Period 6 of 2026-27 | 836 | 38.6% | 2.3% |
| Period 5 of 2026-27 | 853 | 51.8% | 3.3% |
| Period 4 of 2026-27 | 889 | 52.6% | 3.1% |
| Period 3 of 2026-27 | 885 | 62.1% | 3.5% |
| Period 2 of 2026-27 | 889 | 65.6% | 2.5% |
| Period 1 of 2026-27 | 1,019 | 71.2% | 1.8% |
| Period 13 of 2025-26 | 976 | 71.2% | 2.6% |
| Period 12 of 2025-26 | 868 | 75.1% | 2.1% |
| Period 11 of 2025-26 | 861 | 69.1% | 4.1% |
| Period 10 of 2025-26 | 795 | 68.6% | 8.9% |
| Period 9 of 2025-26 | 888 | 57.8% | 3.7% |
| Period 8 of 2025-26 | 878 | 65.4% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stamford (Lincs)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 886 | – | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out