Stallingborough
SLLYorkshire and The HumberManaged by East Midlands Railway
How this station is performing
Stallingborough has usable figures for 4 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,425 scheduled stops, about 15 a day. In those periods 78.0% of stops arrived within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Stallingborough opened on 1 March 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Stallingborough is the oldest; the next oldest, Great Coates, dates from 1848.
The nearest stations to Stallingborough are Healing (1.6 km east), Great Coates (3.8 km east), Habrough (6.0 km west), Grimsby Town (6.9 km east) and Grimsby Docks (7.2 km east). 7 stations lie within 10 km in all. Of the five, Grimsby Town is the most punctual at 79.7% and Habrough the least at 73.3%, with Stallingborough on 78.0%.
Stallingborough takes its name from a Village called Stallingborough, home to about 1,323 people, and the station stands 0.2 km from its centre.
East Midlands Railway is the only operator serving Stallingborough. Here it manages 78.0% within three minutes, 3.4 percentage points better than its 74.6% across its whole network.
Stallingborough is a quiet station, ranked 2440th for entries and exits in 2025-26, with about 6,018 of them. That is roughly 1 passengers for every scheduled stop.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5,425 | 78.0% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Stallingborough? Delay Repay
These operators call at Stallingborough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 389 | 84.1% | 1.5% |
| Period 6 of 2026-27 | 440 | 85.9% | 4.8% |
| Period 5 of 2026-27 | 440 | 66.8% | 8.9% |
| Period 4 of 2026-27 | 440 | 75.3% | 2.5% |
| Period 3 of 2026-27 | 440 | – | 4.3% |
| Period 2 of 2026-27 | 416 | – | 6.3% |
| Period 1 of 2026-27 | 476 | – | 3.2% |
| Period 13 of 2025-26 | 442 | – | 2.9% |
| Period 12 of 2025-26 | 408 | – | 2.0% |
| Period 11 of 2025-26 | 404 | – | 3.7% |
| Period 10 of 2025-26 | 362 | – | 6.6% |
| Period 9 of 2025-26 | 384 | – | 4.2% |
| Period 8 of 2025-26 | 384 | – | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out