South Western Railway at St Denys
All trains at St DenysSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 29,616 scheduled stops at St Denys in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 73.2% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
South Western Railway trains at St Denys also serve Bitterne (0.9 km south-east, 77.5% on time, 1.5% cancelled), Swaythling (2.3 km north, 75.4% on time, 2.5% cancelled), Southampton Central (2.4 km south-west, 68.0% on time, 2.9% cancelled), Woolston (2.7 km south, 75.3% on time, 2.1% cancelled), Sholing (3.3 km south-east, 77.8% on time, 1.6% cancelled) and Millbrook (Hants) (3.4 km west, 79.1% on time, 2.1% cancelled), which are the stations on its network closest to St Denys.
Within 30 km of here, South Western Railway runs best at Ryde St Johns Road, 27.4 km south-east (98.7%), and worst at Winchester, 16.8 km north (67.8%).
The busiest South Western Railway station within 30 km of St Denys is Southampton Central, 2.4 km south-west, with about 189 scheduled stops a day.
South Western Railway at St Denys has slipped sharply. 73.2% of stops came within three minutes of the timetable in the latest 13 periods, 7.6 percentage points worse than the 80.8% recorded in the 13 before. Cancellations rose to 2.2% of scheduled stops from 1.7%, which is 0.5 percentage points more.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,243 | 64.6% | 1.4% |
| Period 6 of 2026-27 | 2,259 | 62.5% | 0.8% |
| Period 5 of 2026-27 | 2,333 | 64.3% | 1.5% |
| Period 4 of 2026-27 | 2,292 | 65.5% | 2.1% |
| Period 3 of 2026-27 | 2,276 | 72.1% | 3.7% |
| Period 2 of 2026-27 | 2,267 | 69.2% | 4.2% |
| Period 1 of 2026-27 | 2,365 | 80.3% | 1.0% |
| Period 13 of 2025-26 | 2,502 | 84.5% | 1.1% |
| Period 12 of 2025-26 | 2,081 | 81.1% | 2.2% |
| Period 11 of 2025-26 | 2,323 | 82.9% | 3.2% |
| Period 10 of 2025-26 | 2,008 | 80.8% | 2.8% |
| Period 9 of 2025-26 | 2,338 | 71.3% | 1.8% |
| Period 8 of 2025-26 | 2,329 | 72.9% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at St Denys
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 3 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out