CrossCountry at St Austell
All trains at St AustellCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 1,445 scheduled stops at St Austell in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 59.5% of recorded arrivals came within three minutes and 12.2% of stops were cancelled.
CrossCountry trains at St Austell also serve Par (6.3 km east, 56.6% on time, 10.7% cancelled), Lostwithiel (11.5 km north-east, 57.1% on time, 11.5% cancelled), Bodmin Parkway (14.8 km north-east, 58.9% on time, 11.7% cancelled), Truro (21.3 km south-west, 56.4% on time, 12.9% cancelled), Liskeard (25.6 km north-east, 55.3% on time, 11.6% cancelled) and Redruth (33.2 km west, 58.9% on time, 14.1% cancelled), which are the stations on its network closest to St Austell.
The busiest CrossCountry station within 30 km of St Austell is Bodmin Parkway, 14.8 km north-east, with about 4 scheduled stops a day.
Of the 2 operators with enough records at St Austell, CrossCountry is the least punctual, at 59.5%.
CrossCountry at St Austell has slipped sharply. 59.5% of stops came within three minutes of the timetable in the latest 13 periods, 11.1 percentage points worse than the 70.6% recorded in the 13 before. Cancellations held steady at 12.2% of scheduled stops, against 12.0% before.
CrossCountry at St Austell has not moved in one direction over three full railway years: 73.8% within three minutes in 2023-24, 73.8% in 2024-25 and 69.3% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 63.5% | 13.3% |
| Period 6 of 2026-27 | 120 | 53.5% | 15.8% |
| Period 5 of 2026-27 | 117 | 43.1% | 12.8% |
| Period 4 of 2026-27 | 120 | 39.6% | 15.8% |
| Period 3 of 2026-27 | 108 | 47.1% | 5.6% |
| Period 2 of 2026-27 | 112 | 52.5% | 11.6% |
| Period 1 of 2026-27 | 120 | 68.1% | 5.8% |
| Period 13 of 2025-26 | 114 | 76.6% | 6.1% |
| Period 12 of 2025-26 | 104 | 70.0% | 3.8% |
| Period 11 of 2025-26 | 104 | 70.9% | 24.0% |
| Period 10 of 2025-26 | 96 | 59.2% | 20.8% |
| Period 9 of 2025-26 | 94 | 65.4% | 17.0% |
| Period 8 of 2025-26 | 116 | 66.0% | 8.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at St Austell
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,888 | 67.0% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out