GTR at St Albans City
All trains at St Albans CityGTR across BritainEast of England
How this operator is doing here
GTR had 119,857 scheduled stops at St Albans City in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 72.2% of recorded arrivals came within three minutes and 5.3% of stops were cancelled.
GTR trains at St Albans City also serve Radlett (7.3 km south, 72.1% on time, 6.5% cancelled), Harpenden (7.3 km north, 80.1% on time, 5.7% cancelled), Hatfield (Herts) (7.9 km east, 86.5% on time, 5.3% cancelled), Welham Green (8.3 km east, 89.3% on time, 4.6% cancelled), Brookmans Park (9.1 km east, 88.8% on time, 4.5% cancelled) and Welwyn Garden City (10.2 km north-east, 85.0% on time, 4.8% cancelled), which are the stations on its network closest to St Albans City.
Within 30 km of here, GTR runs best at Cuffley, 15.7 km east (92.1%), and worst at Mill Hill Broadway, 16.3 km south (70.4%).
The busiest GTR station within 30 km of St Albans City is London St Pancras International, 27.9 km south-east, with about 498 scheduled stops a day.
Of the 1 operators with enough records at St Albans City, GTR is the most punctual, at 72.2%.
GTR at St Albans City has not moved in one direction over three full railway years: 77.9% within three minutes in 2023-24, 72.3% in 2024-25 and 73.1% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,607 | 70.0% | 3.5% |
| Period 6 of 2026-27 | 9,263 | 68.7% | 6.3% |
| Period 5 of 2026-27 | 8,847 | 68.5% | 7.9% |
| Period 4 of 2026-27 | 9,276 | 68.2% | 5.4% |
| Period 3 of 2026-27 | 7,161 | 72.1% | 4.0% |
| Period 2 of 2026-27 | 8,394 | 75.3% | 3.3% |
| Period 1 of 2026-27 | 10,573 | 77.2% | 3.5% |
| Period 13 of 2025-26 | 10,492 | 75.8% | 3.2% |
| Period 12 of 2025-26 | 9,636 | 76.2% | 5.6% |
| Period 11 of 2025-26 | 9,630 | 70.5% | 6.4% |
| Period 10 of 2025-26 | 7,958 | 75.4% | 7.2% |
| Period 9 of 2025-26 | 9,500 | 68.7% | 9.7% |
| Period 8 of 2025-26 | 9,520 | 71.3% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at St Albans City
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 3 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out