Squires Gate
SQUNorth WestManaged by Northern Trains
How this station is performing
Squires Gate has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,047 scheduled stops, about 33 a day. In those periods 75.8% of stops arrived within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Squires Gate opened on 14 September 1931, 95 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Squires Gate is the newest; the oldest, Blackpool North, opened in 1846.
The nearest stations to Squires Gate are Blackpool Pleasure Beach (1.3 km north), Blackpool South (2.4 km north), St Annes-on-the-Sea (3.0 km south-east), Blackpool North (5.1 km north) and Ansdell and Fairhaven (5.4 km south-east). 9 stations lie within 10 km in all. Of the five, Blackpool North is the most punctual at 82.2% and St Annes-on-the-Sea the least at 74.3%, with Squires Gate on 75.8%.
Squires Gate takes its name from a suburb called Squires Gate, and the station stands 1.7 km from its centre.
2 of 3 stations of a similar size in North West are more punctual than Squires Gate on 75.8%. The comparison group includes Ansdell and Fairhaven (76.1%), Blackpool Pleasure Beach (75.8%) and Moss Side (78.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,047 | 75.8% | 4.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 915 | 71.6% | 2.5% |
| Period 6 of 2026-27 | 915 | 75.5% | 3.8% |
| Period 5 of 2026-27 | 920 | 65.8% | 5.7% |
| Period 4 of 2026-27 | 916 | 69.9% | 4.5% |
| Period 3 of 2026-27 | 915 | 75.9% | 4.9% |
| Period 2 of 2026-27 | 920 | 78.9% | 3.7% |
| Period 1 of 2026-27 | 1,059 | – | 3.2% |
| Period 13 of 2025-26 | 1,001 | 81.7% | 5.2% |
| Period 12 of 2025-26 | 914 | 82.6% | 4.4% |
| Period 11 of 2025-26 | 905 | 83.2% | 4.2% |
| Period 10 of 2025-26 | 832 | 83.9% | 6.7% |
| Period 9 of 2025-26 | 915 | 65.4% | 3.2% |
| Period 8 of 2025-26 | 920 | 74.1% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ansdell and Fairhaven | 12,047 | 76.1% | 3.3% |
| Blackpool Pleasure Beach | 12,047 | 75.8% | 4.3% |
| Moss Side | 12,047 | 78.7% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out