Blackpool Pleasure Beach
BPBNorth WestManaged by Northern Trains
How this station is performing
Blackpool Pleasure Beach has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,047 scheduled stops, about 33 a day. In those periods 75.8% of stops arrived within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Blackpool Pleasure Beach opened on 1 October 1913 and closed to passengers on 11 September 1939. It reopened on 13 April 1987, 39 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Blackpool North is the oldest (1846) and Squires Gate the newest (1931), with Blackpool Pleasure Beach in between.
The nearest stations to Blackpool Pleasure Beach are Blackpool South (1.2 km north), Squires Gate (1.3 km south), Blackpool North (3.9 km north), St Annes-on-the-Sea (4.2 km south-east) and Layton (Lancs) (5.5 km north). 9 stations lie within 10 km in all. Of the five, Blackpool North is the most punctual at 82.2% and St Annes-on-the-Sea the least at 74.3%, with Blackpool Pleasure Beach on 75.8%.
Blackpool Pleasure Beach is named after Blackpool, a town, home to about 139,305 people, but the station stands 3.2 km from its centre.
2 of 3 stations of a similar size in North West are more punctual than Blackpool Pleasure Beach on 75.8%. The comparison group includes Ansdell and Fairhaven (76.1%), Moss Side (78.7%) and Squires Gate (75.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,047 | 75.8% | 4.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 915 | 72.2% | 2.5% |
| Period 6 of 2026-27 | 915 | 76.4% | 3.8% |
| Period 5 of 2026-27 | 920 | 66.4% | 5.7% |
| Period 4 of 2026-27 | 916 | 69.7% | 4.5% |
| Period 3 of 2026-27 | 915 | 76.7% | 4.8% |
| Period 2 of 2026-27 | 920 | 79.6% | 3.7% |
| Period 1 of 2026-27 | 1,059 | – | 3.2% |
| Period 13 of 2025-26 | 1,001 | 81.9% | 5.3% |
| Period 12 of 2025-26 | 914 | 82.6% | 4.4% |
| Period 11 of 2025-26 | 905 | 83.1% | 4.2% |
| Period 10 of 2025-26 | 832 | 82.8% | 6.7% |
| Period 9 of 2025-26 | 915 | 65.5% | 3.2% |
| Period 8 of 2025-26 | 920 | 71.6% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ansdell and Fairhaven | 12,047 | 76.1% | 3.3% |
| Moss Side | 12,047 | 78.7% | 3.0% |
| Squires Gate | 12,047 | 75.8% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out