Spring Road
SRIWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Spring Road had 20,424 scheduled stops to Period 7 of 2026-27, about 56 a day. 89.8% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Spring Road opened on 1 July 1908, 118 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Spring Road is the newest; the oldest, Acocks Green, opened in 1852.
The nearest stations to Spring Road are Hall Green (1.0 km south-west), Tyseley (1.1 km north), Acocks Green (1.3 km north-east), Olton (2.3 km east) and Small Heath (2.7 km north-west). 37 stations lie within 10 km in all. Of the five, Tyseley is the most punctual at 92.4% and Olton the least at 89.0%, with Spring Road on 89.8%.
Across the whole run of data, the weakest four-week period for Spring Road was Period 9 of 2023-24, at 81.5%, some time before the latest year. The strongest was Period 1 of 2024-25, at 94.6%, and the two are 13.1 percentage points apart. Cancellations peaked at 11.4% of scheduled stops in Period 8 of 2023-24, against 3.4% over the latest 13 periods.
2 of 3 stations of a similar size in West Midlands are more punctual than Spring Road on 89.8%. The comparison group includes Hall Green (90.2%), Shirley (90.0%) and Yardley Wood (88.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 20,424 | 89.8% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Spring Road? Delay Repay
These operators call at Spring Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,616 | 86.0% | 2.8% |
| Period 6 of 2026-27 | 1,616 | 87.2% | 3.1% |
| Period 5 of 2026-27 | 1,205 | 87.7% | 5.6% |
| Period 4 of 2026-27 | 1,486 | 87.8% | 4.6% |
| Period 3 of 2026-27 | 1,530 | 89.9% | 4.1% |
| Period 2 of 2026-27 | 1,487 | 89.5% | 3.0% |
| Period 1 of 2026-27 | 1,871 | 92.8% | 2.7% |
| Period 13 of 2025-26 | 1,765 | 93.7% | 3.0% |
| Period 12 of 2025-26 | 1,616 | 94.5% | 2.8% |
| Period 11 of 2025-26 | 1,557 | 91.8% | 2.3% |
| Period 10 of 2025-26 | 1,445 | 88.0% | 4.4% |
| Period 9 of 2025-26 | 1,615 | 87.6% | 3.0% |
| Period 8 of 2025-26 | 1,615 | 89.6% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hall Green | 20,424 | 90.2% | 3.4% |
| Shirley | 20,424 | 90.0% | 3.2% |
| Yardley Wood | 20,424 | 88.7% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out