Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Spital

SPINorth WestManaged by Merseyrail

On time, last 13 periods95.2%Great Britain: 83.6%
Cancelled3.6%Great Britain: 3.2%
Stops a day184Scheduled, on average
Punctuality rank125th of 2,374Among ranked stations

How this station is performing

Spital has usable figures for 9 of the last 13 four-week periods to Period 7 of 2026-27, covering 66,871 scheduled stops, about 184 a day. In those periods 95.2% of stops arrived within three minutes of the timetable and 3.6% of scheduled stops were cancelled.

Spital opened on 30 May 1846, 180 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bebington is the oldest (1840) and Eastham Rake the newest (1995), with Spital in between.

The nearest stations to Spital are Port Sunlight (1.0 km north), Bromborough Rake (1.1 km south), Bromborough (2.0 km south), Bebington (2.1 km north) and Eastham Rake (3.7 km south). 37 stations lie within 10 km in all. At 95.2%, Spital is more punctual than every one of them; the best of the five, Bromborough, manages 88.3%.

Spital is one of 5 stations named after a suburb called Spital, home to about 4,190 people; this one stands 0.5 km from its centre.

Compared with 3 stations of a similar size in North West, Spital is the most punctual, at 95.2%. The comparison group includes Eastham Rake (88.2%), Port Sunlight (88.0%) and Bebington (88.0%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 2 of 2023-24: 96.4%Period 4 of 2023-24: 96.2%Period 5 of 2023-24: 95.0%Period 6 of 2023-24: 95.6%Period 7 of 2023-24: 91.9%Period 12 of 2023-24: 93.7%Period 1 of 2024-25: 95.3%Period 2 of 2024-25: 94.2%Period 3 of 2024-25: 95.8%Period 4 of 2024-25: 94.2%Period 5 of 2024-25: 95.3%Period 6 of 2024-25: 95.6%Period 7 of 2024-25: 95.9%Period 11 of 2024-25: 91.0%Period 2 of 2025-26: 94.6%Period 3 of 2025-26: 95.3%Period 4 of 2025-26: 95.3%Period 5 of 2025-26: 93.1%Period 6 of 2025-26: 95.1%Period 7 of 2025-26: 93.9%Period 11 of 2025-26: 94.2%Period 12 of 2025-26: 92.6%Period 13 of 2025-26: 96.7%Period 1 of 2026-27: 96.4%Period 2 of 2026-27: 96.4%Period 3 of 2026-27: 94.4%Period 4 of 2026-27: 94.2%Period 5 of 2026-27: 96.2%Period 6 of 2026-27: 94.8%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 1.8%Period 2 of 2023-24: 1.1%Period 3 of 2023-24: 1.3%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 2.2%Period 6 of 2023-24: 4.8%Period 7 of 2023-24: 5.0%Period 8 of 2023-24: 5.0%Period 9 of 2023-24: 4.1%Period 10 of 2023-24: 7.3%Period 11 of 2023-24: 6.0%Period 12 of 2023-24: 3.9%Period 13 of 2023-24: 4.0%Period 1 of 2024-25: 4.1%Period 2 of 2024-25: 5.3%Period 3 of 2024-25: 3.8%Period 4 of 2024-25: 4.1%Period 5 of 2024-25: 3.9%Period 6 of 2024-25: 3.8%Period 7 of 2024-25: 2.6%Period 8 of 2024-25: 3.0%Period 9 of 2024-25: 5.7%Period 10 of 2024-25: 2.2%Period 11 of 2024-25: 8.2%Period 12 of 2024-25: 2.9%Period 13 of 2024-25: 3.7%Period 1 of 2025-26: 3.0%Period 2 of 2025-26: 3.0%Period 3 of 2025-26: 3.5%Period 4 of 2025-26: 2.6%Period 5 of 2025-26: 4.1%Period 6 of 2025-26: 3.6%Period 7 of 2025-26: 4.0%Period 8 of 2025-26: 3.6%Period 9 of 2025-26: 1.7%Period 10 of 2025-26: 1.5%Period 11 of 2025-26: 6.2%Period 12 of 2025-26: 5.1%Period 13 of 2025-26: 3.2%Period 1 of 2026-27: 2.4%Period 2 of 2026-27: 2.6%Period 3 of 2026-27: 4.1%Period 4 of 2026-27: 5.1%Period 5 of 2026-27: 4.0%Period 6 of 2026-27: 5.7%Period 7 of 2026-27: 1.4%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Merseyrail66,87195.2%3.6%

Operators with their own page for this station are linked to it.

Late train at Spital? Delay Repay

These operators call at Spital and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,192–1.4%
Period 6 of 2026-275,09094.8%5.7%
Period 5 of 2026-275,08796.2%4.0%
Period 4 of 2026-274,77194.2%5.1%
Period 3 of 2026-275,08694.4%4.1%
Period 2 of 2026-275,09096.4%2.6%
Period 1 of 2026-275,84696.4%2.4%
Period 13 of 2025-265,59696.7%3.2%
Period 12 of 2025-265,08892.6%5.1%
Period 11 of 2025-265,08494.2%6.2%
Period 10 of 2025-264,648–1.5%
Period 9 of 2025-265,143–1.7%
Period 8 of 2025-265,150–3.6%

Time of year

80%90%100%P1: 95.9%1P2: 95.4%2P3: 95.2%3P4: 95.0%4P5: 94.9%5P6: 95.3%6P7: 93.9%78910P11: 92.7%11P12: 93.1%1213

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Eastham Rake66,87188.2%3.6%
Port Sunlight66,87188.0%3.6%
Bebington66,91188.0%3.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out