Sleights
SLHYorkshire and The HumberManaged by Northern Trains
How this station is performing
Sleights has usable figures for 9 of the last 13 four-week periods to Period 7 of 2026-27, covering 3,976 scheduled stops, about 11 a day. In those periods 84.9% of stops arrived within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Sleights opened on 8 June 1835, 191 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sleights is the oldest; the next oldest, Ruswarp, dates from 1835.
The nearest stations to Sleights are Ruswarp (2.5 km north-east), Whitby (4.0 km north-east), Grosmont (4.9 km south-west), Egton (6.9 km west) and Glaisdale (8.8 km west). 5 stations lie within 10 km in all. Of the five, Egton is the most punctual at 85.3% and Ruswarp the least at 84.6%, with Sleights on 84.9%.
Sleights takes its name from a Village called Sleights, and the station stands 1.2 km from its centre.
Sleights improved sharply over the past year. In the latest 13 periods 84.9% of stops came within three minutes of the timetable, up 7.6 percentage points from 77.3% in the 13 before. Cancellations fell to 1.5% of scheduled stops from 2.4%, which is 0.9 percentage points fewer.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Sleights on 84.9%. The comparison group includes Ruswarp (84.6%), Egton (85.3%) and Glaisdale (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 3,976 | 84.9% | 1.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 320 | – | 0.0% |
| Period 6 of 2026-27 | 320 | 92.4% | 1.3% |
| Period 5 of 2026-27 | 320 | 87.1% | 1.9% |
| Period 4 of 2026-27 | 320 | 86.6% | 0.0% |
| Period 3 of 2026-27 | 320 | – | 4.1% |
| Period 2 of 2026-27 | 320 | 89.4% | 3.1% |
| Period 1 of 2026-27 | 368 | – | 1.1% |
| Period 13 of 2025-26 | 352 | – | 1.4% |
| Period 12 of 2025-26 | 260 | 93.7% | 0.8% |
| Period 11 of 2025-26 | 320 | 86.8% | 0.6% |
| Period 10 of 2025-26 | 260 | 80.4% | 0.8% |
| Period 9 of 2025-26 | 248 | 70.5% | 2.8% |
| Period 8 of 2025-26 | 248 | 73.1% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out