Slateford
SLAScotlandManaged by ScotRail
How this station is performing
Slateford had 13,378 scheduled stops to Period 7 of 2026-27, about 37 a day. 86.8% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Slateford opened on 1 January 1853, 173 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Haymarket is the oldest (1842) and Edinburgh Park the newest (2003), with Slateford in between.
The nearest stations to Slateford are Kingsknowe (1.6 km south-west), Haymarket (2.5 km north-east), Wester Hailes (2.9 km south-west), South Gyle (3.6 km west) and Edinburgh Park (4.0 km west). 11 stations lie within 10 km in all. Of the five, Edinburgh Park is the most punctual at 90.2% and Kingsknowe the least at 80.8%, with Slateford on 86.8%.
Slateford takes its name from a suburb called Slateford, and the station stands 0.2 km from its centre.
The time of year matters a great deal for Slateford. Averaged over every railway year in the data, period 8 (late October and November) is the weakest at 81.5%, while period 13 (March) is the strongest at 91.5%, a spread of 10.0 percentage points.
Compared with 3 stations of a similar size in Scotland, Slateford is the most punctual, at 86.8%. The comparison group includes Holytown (86.5%), Laurencekirk (82.4%) and Curriehill (83.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 13,378 | 86.8% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Slateford? Delay Repay
These operators call at Slateford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,041 | 83.4% | 1.6% |
| Period 6 of 2026-27 | 1,057 | 86.0% | 0.7% |
| Period 5 of 2026-27 | 1,057 | 85.7% | 0.4% |
| Period 4 of 2026-27 | 1,017 | 86.9% | 2.8% |
| Period 3 of 2026-27 | 1,056 | 87.0% | 1.4% |
| Period 2 of 2026-27 | 1,012 | 85.6% | 0.9% |
| Period 1 of 2026-27 | 1,175 | 89.8% | 2.2% |
| Period 13 of 2025-26 | 870 | 90.3% | 0.6% |
| Period 12 of 2025-26 | 1,056 | 89.4% | 1.5% |
| Period 11 of 2025-26 | 1,056 | 89.4% | 1.2% |
| Period 10 of 2025-26 | 908 | 87.4% | 1.2% |
| Period 9 of 2025-26 | 1,037 | 83.6% | 1.8% |
| Period 8 of 2025-26 | 1,036 | 84.1% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Holytown | 13,397 | 86.5% | 1.5% |
| Laurencekirk | 13,429 | 82.4% | 2.2% |
| Curriehill | 13,698 | 83.3% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out