Northern at Shipley (Yorks)
All trains at Shipley (Yorks)Northern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 91,604 scheduled stops at Shipley (Yorks) in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 87.2% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Northern trains at Shipley (Yorks) also serve Saltaire (1.3 km north-west, 88.3% on time, 1.3% cancelled), Frizinghall (1.5 km south, 90.2% on time, 1.3% cancelled), Baildon (2.3 km north-east, 90.2% on time, 1.3% cancelled), Bradford Forster Square (4.2 km south, 93.3% on time, 1.3% cancelled), Apperley Bridge (4.5 km east, 89.7% on time, 1.0% cancelled) and Bingley (4.5 km west, 85.4% on time, 1.4% cancelled), which are the stations on its network closest to Shipley (Yorks).
Within 30 km of here, Northern runs best at Bradford Forster Square, 4.2 km south (93.3%), and worst at Sowerby Bridge, 16.5 km south-west (58.5%).
The busiest Northern station within 30 km of Shipley (Yorks) is Leeds, 15.4 km east, with about 780 scheduled stops a day.
Of the 2 operators with enough records at Shipley (Yorks), Northern is the most punctual, at 87.2%.
For Northern, Shipley (Yorks) is the 74th best of 493 ranked stations. Its 87.2% here is 8.6 percentage points above the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,048 | 89.6% | 0.6% |
| Period 6 of 2026-27 | 7,048 | 87.8% | 1.3% |
| Period 5 of 2026-27 | 6,699 | 89.7% | 0.9% |
| Period 4 of 2026-27 | 6,848 | 89.9% | 1.7% |
| Period 3 of 2026-27 | 7,020 | 87.7% | 2.3% |
| Period 2 of 2026-27 | 7,048 | 89.0% | 1.3% |
| Period 1 of 2026-27 | 7,806 | 89.2% | 1.6% |
| Period 13 of 2025-26 | 7,671 | 90.4% | 0.4% |
| Period 12 of 2025-26 | 7,046 | 89.8% | 0.8% |
| Period 11 of 2025-26 | 7,048 | 87.5% | 1.4% |
| Period 10 of 2025-26 | 6,340 | 83.5% | 1.5% |
| Period 9 of 2025-26 | 6,982 | 78.0% | 2.0% |
| Period 8 of 2025-26 | 7,000 | 80.4% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Shipley (Yorks)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 4,784 | 81.7% | 5.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out