Seaforth and Litherland
SFLNorth WestManaged by Merseyrail
How this station is performing
Seaforth and Litherland had 48,898 scheduled stops to Period 7 of 2026-27, about 134 a day. 92.2% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Seaforth and Litherland opened on 1 October 1850. It was moved to the site it uses now on 26 December 1886. Among the 5 stations nearest to it with a known opening date, Waterloo (Merseyside) is the oldest (1848) and Orrell Park the newest (1906), with Seaforth and Litherland in between.
The nearest stations to Seaforth and Litherland are Bootle New Strand (1.6 km south-east), Waterloo (Merseyside) (1.7 km north-west), Bootle Oriel Road (2.2 km south), Walton (Merseyside) (2.8 km east) and Orrell Park (2.8 km east). 39 stations lie within 10 km in all. Of the five, Orrell Park is the most punctual at 94.6% and Walton (Merseyside) the least at 92.1%, with Seaforth and Litherland on 92.2%.
Seaforth and Litherland is named after Litherland, a suburb, home to about 22,242 people, but the station stands 0.9 km from its centre.
Compared with 3 stations of a similar size in North West, Seaforth and Litherland is the least punctual, at 92.2%. All of them are ahead, including Bank Hall (94.9%), Bootle New Strand (93.8%) and Freshfield (92.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 48,898 | 92.2% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Seaforth and Litherland? Delay Repay
These operators call at Seaforth and Litherland and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,709 | 93.7% | 1.3% |
| Period 6 of 2026-27 | 3,788 | 94.4% | 1.0% |
| Period 5 of 2026-27 | 3,852 | 91.1% | 1.4% |
| Period 4 of 2026-27 | 3,543 | 88.2% | 1.3% |
| Period 3 of 2026-27 | 3,784 | 91.9% | 0.6% |
| Period 2 of 2026-27 | 3,710 | 92.6% | 1.1% |
| Period 1 of 2026-27 | 4,288 | 91.4% | 1.1% |
| Period 13 of 2025-26 | 4,060 | 92.1% | 1.1% |
| Period 12 of 2025-26 | 3,709 | 91.3% | 1.0% |
| Period 11 of 2025-26 | 3,715 | 91.4% | 1.0% |
| Period 10 of 2025-26 | 3,316 | 94.0% | 1.5% |
| Period 9 of 2025-26 | 3,705 | 94.0% | 1.0% |
| Period 8 of 2025-26 | 3,719 | 93.0% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bank Hall | 48,898 | 94.9% | 1.2% |
| Bootle New Strand | 48,898 | 93.8% | 1.2% |
| Freshfield | 48,899 | 92.3% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out