Scarborough
SCAYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Scarborough had 23,843 scheduled stops to Period 7 of 2026-27, about 66 a day. 84.3% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Scarborough opened on 8 July 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Scarborough is the oldest; the next oldest, Seamer, dates from 1845.
The nearest stations to Scarborough are Seamer (4.3 km south), Filey (10.6 km south-east), Hunmanby (13.1 km south-east), Bempton (22.3 km south-east) and Bridlington (25.5 km south-east). 1 stations lie within 10 km in all. At 84.3%, Scarborough is more punctual than every one of them; the best of the five, Seamer, manages 82.0%.
Scarborough takes its name from a town called Scarborough, home to about 61,749 people, and the station stands 0.6 km from its centre.
2 operators call at Scarborough: TransPennine Express (87.3%, 54% of stops) and Northern (80.5%, 46% of stops). The operator you travel with matters: TransPennine Express reaches 87.3% within three minutes while Northern manages 80.5%, a gap of 6.8 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Scarborough is the most punctual, at 84.3%. The comparison group includes Grimsby Town (79.7%), Adwick (76.2%) and Bridlington (79.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 12,951 | 87.3% | 1.3% |
| Northern | 10,892 | 80.5% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Scarborough? Delay Repay
These operators call at Scarborough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,813 | 80.2% | 1.7% |
| Period 6 of 2026-27 | 1,788 | 76.9% | 2.6% |
| Period 5 of 2026-27 | 1,812 | 83.4% | 4.1% |
| Period 4 of 2026-27 | 1,816 | 80.3% | 3.0% |
| Period 3 of 2026-27 | 1,816 | 79.0% | 2.6% |
| Period 2 of 2026-27 | 1,815 | 82.1% | 2.0% |
| Period 1 of 2026-27 | 2,083 | 87.2% | 2.2% |
| Period 13 of 2025-26 | 2,001 | 89.4% | 1.4% |
| Period 12 of 2025-26 | 1,816 | 88.8% | 1.5% |
| Period 11 of 2025-26 | 1,792 | 88.6% | 3.3% |
| Period 10 of 2025-26 | 1,668 | 88.6% | 3.8% |
| Period 9 of 2025-26 | 1,811 | 81.7% | 4.9% |
| Period 8 of 2025-26 | 1,812 | 88.3% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Grimsby Town | 23,762 | 79.7% | 3.1% |
| Adwick | 23,761 | 76.2% | 3.2% |
| Bridlington | 23,930 | 79.0% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out