Saundersfoot
SDFWalesManaged by TfW Rail
How this station is performing
Saundersfoot has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,997 scheduled stops, about 16 a day. In those periods 57.2% of stops arrived within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Saundersfoot opened on 5 September 1866. It was moved to the site it uses now on 30 June 1868. Of the 5 stations nearest to it with a known opening date, Saundersfoot is the newest; the oldest, Tenby, opened in 1863.
The nearest stations to Saundersfoot are Kilgetty (1.2 km north), Tenby (5.5 km south), Penally (7.0 km south), Manorbier (8.6 km south-west) and Narberth (8.6 km north). 5 stations lie within 10 km in all. At 57.2%, Saundersfoot is less punctual than all of them; the best of the five, Manorbier, manages 76.6%.
Saundersfoot takes its name from a Village called Saundersfoot, home to about 2,784 people, and the station stands 1.7 km from its centre.
For Saundersfoot, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 43.8% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2025-26, at 77.1%, which is 33.3 percentage points higher. Cancellations peaked at 9.0% of scheduled stops in Period 10 of 2024-25, against 3.2% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Saundersfoot is the least punctual, at 57.2%. All of them are ahead, including Kilgetty (58.5%), Narberth (58.5%) and Manorbier (76.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,929 | 57.3% | 3.1% |
| Great Western Railway | 68 | – | – |
Operators with their own page for this station are linked to it.
Late train at Saundersfoot? Delay Repay
These operators call at Saundersfoot and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 62.5% | 1.7% |
| Period 6 of 2026-27 | 496 | 54.5% | 2.2% |
| Period 5 of 2026-27 | 490 | 50.7% | 3.1% |
| Period 4 of 2026-27 | 490 | – | 4.5% |
| Period 3 of 2026-27 | 488 | 54.9% | 3.1% |
| Period 2 of 2026-27 | 474 | 49.8% | 3.6% |
| Period 1 of 2026-27 | 531 | 54.0% | 2.4% |
| Period 13 of 2025-26 | 416 | 56.0% | 0.7% |
| Period 12 of 2025-26 | 464 | 77.1% | 1.5% |
| Period 11 of 2025-26 | 426 | 68.8% | 2.3% |
| Period 10 of 2025-26 | 419 | 60.1% | 4.8% |
| Period 9 of 2025-26 | 450 | 43.8% | 4.4% |
| Period 8 of 2025-26 | 389 | 57.0% | 7.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out