Narberth
NARWalesManaged by TfW Rail
How this station is performing
Narberth has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,963 scheduled stops, about 16 a day. In those periods 58.5% of stops arrived within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Narberth opened on 5 September 1866, 160 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Narberth is the newest; the oldest, Clunderwen, opened in 1854.
The nearest stations to Narberth are Clunderwen (4.5 km north), Kilgetty (7.5 km south), Whitland (8.0 km east), Saundersfoot (8.6 km south) and Clarbeston Road (12.1 km north-west). 4 stations lie within 10 km in all. Of the five, Clarbeston Road is the most punctual at 76.5% and Saundersfoot the least at 57.2%, with Narberth on 58.5%.
Narberth takes its name from a town called Narberth, home to about 3,009 people, and the station stands 1.0 km from its centre.
For Narberth, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 44.4% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 78.6%, which is 34.2 percentage points higher. Cancellations peaked at 8.8% of scheduled stops in Period 10 of 2024-25, against 3.1% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Narberth on 58.5%. The comparison group includes Kilgetty (58.5%), Manorbier (76.6%) and Pembroke (74.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,929 | 58.5% | 3.0% |
| Great Western Railway | 34 | – | – |
Operators with their own page for this station are linked to it.
Late train at Narberth? Delay Repay
These operators call at Narberth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 60.7% | 1.7% |
| Period 6 of 2026-27 | 490 | 58.6% | 2.0% |
| Period 5 of 2026-27 | 482 | 53.0% | 2.9% |
| Period 4 of 2026-27 | 482 | – | 4.4% |
| Period 3 of 2026-27 | 480 | 56.7% | 2.7% |
| Period 2 of 2026-27 | 470 | 53.5% | 3.4% |
| Period 1 of 2026-27 | 531 | 55.0% | 2.4% |
| Period 13 of 2025-26 | 416 | 59.2% | 0.7% |
| Period 12 of 2025-26 | 464 | 77.1% | 1.5% |
| Period 11 of 2025-26 | 426 | 66.5% | 2.3% |
| Period 10 of 2025-26 | 419 | 59.7% | 4.8% |
| Period 9 of 2025-26 | 450 | 44.4% | 4.4% |
| Period 8 of 2025-26 | 389 | 56.9% | 7.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out