Sandwich
SDWSouth EastManaged by Southeastern
How this station is performing
Sandwich had 15,725 scheduled stops to Period 7 of 2026-27, about 43 a day. 76.7% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Sandwich opened on 1 July 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Minster is the oldest (1846) and Thanet Parkway the newest (2023), with Sandwich in between.
The nearest stations to Sandwich are Deal (6.5 km south-east), Minster (6.8 km north), Thanet Parkway (6.9 km north), Walmer (7.9 km south) and Ramsgate (9.0 km north-east). 5 stations lie within 10 km in all. At 76.7%, Sandwich is less punctual than all of them; the best of the five, Minster, manages 82.4%.
Sandwich takes its name from a market town called Sandwich, home to about 4,985 people, and the station stands 0.6 km from its centre.
For Sandwich, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 67.3% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 86.5%, which is 19.2 percentage points higher. Cancellations peaked at 6.9% of scheduled stops in Period 12 of 2023-24, against 1.2% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Sandwich on 76.7%. The comparison group includes Fishbourne (Sussex) (74.1%), Seer Green and Jordans (88.6%) and Overton (81.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 15,725 | 76.7% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Sandwich? Delay Repay
These operators call at Sandwich and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,190 | 74.1% | 1.1% |
| Period 6 of 2026-27 | 1,171 | 74.0% | 0.9% |
| Period 5 of 2026-27 | 1,216 | 75.0% | 0.8% |
| Period 4 of 2026-27 | 1,219 | 78.0% | 1.9% |
| Period 3 of 2026-27 | 1,220 | 69.8% | 1.2% |
| Period 2 of 2026-27 | 1,198 | 76.2% | 1.2% |
| Period 1 of 2026-27 | 1,385 | 84.9% | 0.4% |
| Period 13 of 2025-26 | 1,240 | 83.4% | 2.9% |
| Period 12 of 2025-26 | 1,219 | 80.8% | 0.6% |
| Period 11 of 2025-26 | 1,218 | 81.5% | 0.7% |
| Period 10 of 2025-26 | 1,011 | 75.7% | 1.0% |
| Period 9 of 2025-26 | 1,219 | 74.2% | 1.4% |
| Period 8 of 2025-26 | 1,219 | 67.3% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fishbourne (Sussex) | 15,721 | 74.1% | 6.0% |
| Seer Green and Jordans | 15,738 | 88.6% | 1.5% |
| Overton | 15,701 | 81.6% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out