Northern at Saltburn
How this operator is doing here
Northern had 22,362 scheduled stops at Saltburn in the 13 periods to Period 7 of 2026-27, 93% of the station's total. 90.5% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
Northern trains at Saltburn also serve Marske (2.8 km west, 91.0% on time, 3.7% cancelled), Longbeck (3.7 km west, 88.7% on time, 3.7% cancelled), Redcar East (5.7 km north-west, 90.0% on time, 3.7% cancelled), Redcar Central (7.1 km north-west, 88.1% on time, 2.9% cancelled), Commondale (11.4 km south, – on time, 1.2% cancelled) and South Bank (13.0 km west, 94.5% on time, 2.1% cancelled), which are the stations on its network closest to Saltburn.
Within 30 km of here, Northern runs best at South Bank, 13.0 km west (94.5%), and worst at Horden, 29.3 km north-west (76.3%).
The busiest Northern station within 30 km of Saltburn is Middlesbrough, 16.7 km west, with about 134 scheduled stops a day.
Of the 2 operators with enough records at Saltburn, Northern is the most punctual, at 90.5%.
For Northern, Saltburn is the 27th best of 493 ranked stations. Its 90.5% here is 11.9 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Saltburn has got worse each time, from 90.8% within three minutes in 2023-24 to 90.0% in 2024-25 and 89.3% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,661 | 91.0% | 2.6% |
| Period 6 of 2026-27 | 1,728 | 91.5% | 4.5% |
| Period 5 of 2026-27 | 1,728 | 86.7% | 3.2% |
| Period 4 of 2026-27 | 1,725 | 92.0% | 3.2% |
| Period 3 of 2026-27 | 1,728 | 95.3% | 5.9% |
| Period 2 of 2026-27 | 1,728 | 90.4% | 2.1% |
| Period 1 of 2026-27 | 1,996 | 90.4% | 2.0% |
| Period 13 of 2025-26 | 1,659 | 90.7% | 4.1% |
| Period 12 of 2025-26 | 1,728 | 92.8% | 1.7% |
| Period 11 of 2025-26 | 1,728 | 92.1% | 4.0% |
| Period 10 of 2025-26 | 1,502 | 88.4% | 7.4% |
| Period 9 of 2025-26 | 1,724 | 87.3% | 4.0% |
| Period 8 of 2025-26 | 1,727 | 88.2% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Saltburn
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 1,632 | 70.1% | 9.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out