Northern at Salford Crescent
All trains at Salford CrescentNorthern across BritainNorth West
How this operator is doing here
Northern had 88,723 scheduled stops at Salford Crescent in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 74.3% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
Northern trains at Salford Crescent also serve Salford Central (1.4 km east, 78.5% on time, 3.0% cancelled), Deansgate (2.1 km south-east, 59.6% on time, 3.7% cancelled), Manchester Victoria (2.2 km east, 74.1% on time, 2.9% cancelled), Manchester Oxford Road (2.6 km south-east, 56.2% on time, 3.3% cancelled), Manchester Piccadilly (3.2 km east, 75.9% on time, 2.7% cancelled) and Eccles (Manchester) (3.9 km west, 60.0% on time, 2.6% cancelled), which are the stations on its network closest to Salford Crescent.
Within 30 km of here, Northern runs best at Rose Hill Marple, 16.6 km south-east (93.3%), and worst at Moses Gate, 11.3 km north-west (52.6%).
The busiest Northern station within 30 km of Salford Crescent is Manchester Piccadilly, 3.2 km east, with about 508 scheduled stops a day.
Northern at Salford Crescent has slipped a little, from 77.5% within three minutes in the previous 13 periods to 74.3% in the latest 13, a fall of 3.2 percentage points. Cancellations fell to 3.4% of scheduled stops from 4.9%, which is 1.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,815 | 71.9% | 2.7% |
| Period 6 of 2026-27 | 6,805 | 77.0% | 2.2% |
| Period 5 of 2026-27 | 6,774 | 77.4% | 4.9% |
| Period 4 of 2026-27 | 6,479 | 73.2% | 4.2% |
| Period 3 of 2026-27 | 6,222 | 74.7% | 3.7% |
| Period 2 of 2026-27 | 6,816 | 74.0% | 3.2% |
| Period 1 of 2026-27 | 7,904 | 77.0% | 2.2% |
| Period 13 of 2025-26 | 7,436 | 77.7% | 4.3% |
| Period 12 of 2025-26 | 6,855 | 77.8% | 2.2% |
| Period 11 of 2025-26 | 6,799 | 76.0% | 2.4% |
| Period 10 of 2025-26 | 6,204 | 74.5% | 5.6% |
| Period 9 of 2025-26 | 6,812 | 62.7% | 4.3% |
| Period 8 of 2025-26 | 6,802 | 71.0% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Salford Crescent
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out