West Midlands Railway at Runcorn
All trains at RuncornWest Midlands Railway across BritainNorth West
How this operator is doing here
West Midlands Railway had 21,017 scheduled stops at Runcorn in the 13 periods to Period 7 of 2026-27, 42% of the station's total. 69.9% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
West Midlands Railway trains at Runcorn also serve Liverpool South Parkway (10.2 km west, 71.5% on time, 5.1% cancelled), Acton Bridge (Cheshire) (12.2 km south-east, 61.3% on time, 4.4% cancelled), Mossley Hill (12.5 km west, 83.9% on time, 4.7% cancelled), Hartford (Cheshire) (16.4 km south-east, 62.0% on time, 4.3% cancelled), Liverpool Lime Street (17.6 km north-west, 70.9% on time, 6.0% cancelled) and Winsford (23.2 km south-east, 63.9% on time, 4.4% cancelled), which are the stations on its network closest to Runcorn.
Within 30 km of here, West Midlands Railway runs best at Mossley Hill, 12.5 km west (83.9%), and worst at Acton Bridge (Cheshire), 12.2 km south-east (61.3%).
The busiest West Midlands Railway station within 30 km of Runcorn is Liverpool Lime Street, 17.6 km north-west, with about 58 scheduled stops a day.
West Midlands Railway at Runcorn has slipped a little, from 73.9% within three minutes in the previous 13 periods to 69.9% in the latest 13, a fall of 4.0 percentage points. Cancellations held steady at 4.0% of scheduled stops, against 4.0% before.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,636 | 70.2% | 2.0% |
| Period 6 of 2026-27 | 1,636 | 67.9% | 1.7% |
| Period 5 of 2026-27 | 1,636 | 66.7% | 4.5% |
| Period 4 of 2026-27 | 1,554 | 61.2% | 8.9% |
| Period 3 of 2026-27 | 1,521 | 66.7% | 2.8% |
| Period 2 of 2026-27 | 1,558 | 70.0% | 5.6% |
| Period 1 of 2026-27 | 1,879 | 78.6% | 2.3% |
| Period 13 of 2025-26 | 1,717 | 72.6% | 4.7% |
| Period 12 of 2025-26 | 1,628 | 76.6% | 3.1% |
| Period 11 of 2025-26 | 1,601 | 68.6% | 7.4% |
| Period 10 of 2025-26 | 1,430 | 69.1% | 3.2% |
| Period 9 of 2025-26 | 1,593 | 65.8% | 5.1% |
| Period 8 of 2025-26 | 1,628 | 71.4% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Runcorn
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 17,486 | 67.9% | 6.0% |
| Transport for Wales | 11,819 | 86.2% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out