Rose Hill Marple
RSHNorth WestManaged by Northern Trains
How this station is performing
Rose Hill Marple had 12,374 scheduled stops to Period 7 of 2026-27, about 34 a day. 93.3% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Rose Hill Marple opened on 2 August 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hazel Grove is the oldest (1857) and Bredbury the newest (1875), with Rose Hill Marple in between.
The nearest stations to Rose Hill Marple are Marple (1.4 km east), Romiley (2.2 km north-west), Hazel Grove (3.7 km south-west), Strines (3.7 km south-east) and Bredbury (3.7 km north-west). 42 stations lie within 10 km in all. At 93.3%, Rose Hill Marple is more punctual than every one of them; the best of the five, Strines, manages 90.8%.
The time of year matters a great deal for Rose Hill Marple. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 85.9%, while period 12 (February) is the strongest at 95.6%, a spread of 9.7 percentage points.
1 of 3 stations of a similar size in North West are more punctual than Rose Hill Marple on 93.3%. The comparison group includes Belle Vue (90.9%), Brampton (Cumbria) (80.6%) and Harrington (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,374 | 93.3% | 1.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 980 | 94.9% | 0.8% |
| Period 6 of 2026-27 | 980 | 94.5% | 1.5% |
| Period 5 of 2026-27 | 880 | 94.4% | 2.3% |
| Period 4 of 2026-27 | 961 | 91.9% | 1.1% |
| Period 3 of 2026-27 | 877 | 94.5% | 0.3% |
| Period 2 of 2026-27 | 980 | 94.3% | 2.1% |
| Period 1 of 2026-27 | 1,137 | 93.5% | 3.3% |
| Period 13 of 2025-26 | 1,062 | 96.1% | 0.8% |
| Period 12 of 2025-26 | 693 | 96.4% | 2.5% |
| Period 11 of 2025-26 | 980 | 94.2% | 0.8% |
| Period 10 of 2025-26 | 894 | 93.2% | 4.3% |
| Period 9 of 2025-26 | 971 | 84.6% | 3.6% |
| Period 8 of 2025-26 | 979 | 91.2% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Belle Vue | 12,421 | 90.9% | 2.2% |
| Brampton (Cumbria) | 12,318 | 80.6% | 3.6% |
| Harrington | 12,466 | 94.1% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out