Brampton (Cumbria)
BMPNorth WestManaged by Northern Trains
How this station is performing
Brampton (Cumbria) has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,318 scheduled stops, about 34 a day. In those periods 80.6% of stops arrived within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Brampton (Cumbria) opened on 20 July 1836, 190 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Brampton (Cumbria) is the oldest; the next oldest, Wetheral, dates from 1836.
The nearest stations to Brampton (Cumbria) are Wetheral (9.8 km south-west), Armathwaite (14.3 km south), Carlisle (15.4 km west), Haltwhistle (15.9 km east) and Lazonby and Kirkoswald (20.2 km south). 1 stations lie within 10 km in all. At 80.6%, Brampton (Cumbria) is more punctual than every one of them; the best of the five, Haltwhistle, manages 79.8%.
Brampton (Cumbria) is named after Brampton, a market town, home to about 4,627 people, but the station stands 2.1 km from its centre.
Compared with 3 stations of a similar size in North West, Brampton (Cumbria) is the least punctual, at 80.6%. All of them are ahead, including Rose Hill Marple (93.3%), Belle Vue (90.9%) and Harrington (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,318 | 80.6% | 3.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,016 | 80.6% | 4.6% |
| Period 6 of 2026-27 | 1,016 | 85.1% | 3.6% |
| Period 5 of 2026-27 | 1,016 | 83.1% | 4.6% |
| Period 4 of 2026-27 | 1,016 | 82.2% | 4.2% |
| Period 3 of 2026-27 | 1,016 | 85.9% | 1.9% |
| Period 2 of 2026-27 | 1,016 | 81.3% | 3.8% |
| Period 1 of 2026-27 | 1,168 | – | 3.7% |
| Period 13 of 2025-26 | 1,117 | 81.3% | 3.2% |
| Period 12 of 2025-26 | 1,016 | 83.0% | 2.1% |
| Period 11 of 2025-26 | 985 | 81.4% | 4.7% |
| Period 10 of 2025-26 | 784 | 62.6% | 5.5% |
| Period 9 of 2025-26 | 576 | 67.7% | 1.9% |
| Period 8 of 2025-26 | 576 | 81.3% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rose Hill Marple | 12,374 | 93.3% | 1.9% |
| Belle Vue | 12,421 | 90.9% | 2.2% |
| Harrington | 12,466 | 94.1% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out