Southeastern at Rochester
All trains at RochesterSoutheastern across BritainSouth East
How this operator is doing here
Southeastern had 66,051 scheduled stops at Rochester in the 13 periods to Period 7 of 2026-27, 72% of the station's total. 77.4% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Southeastern trains at Rochester also serve Strood (Kent) (1.0 km north-west, 87.8% on time, 1.6% cancelled), Chatham (1.4 km south-east, 77.2% on time, 1.8% cancelled), Gillingham (Kent) (3.1 km east, 77.4% on time, 1.4% cancelled), Cuxton (3.6 km south-west, 94.1% on time, 1.6% cancelled), Higham (5.1 km north-west, 79.5% on time, 1.8% cancelled) and Halling (5.9 km south-west, 95.0% on time, 1.6% cancelled), which are the stations on its network closest to Rochester.
Within 30 km of here, Southeastern runs best at Yalding, 19.2 km south (95.3%), and worst at Teynham, 21.7 km east (67.8%).
The busiest Southeastern station within 30 km of Rochester is Orpington, 29.1 km west, with about 344 scheduled stops a day.
Of the 2 operators with enough records at Rochester, Southeastern is the least punctual, at 77.4%.
For Southeastern, Rochester is the 139th best of 173 ranked stations. Its 77.4% here is 6.8 percentage points below the 84.2% across the whole network.
Cancellations of Southeastern at Rochester are near its usual level: 1.7% of scheduled stops, against 1.7% across its network and 2.6% for every operator at the station.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,111 | 75.3% | 1.5% |
| Period 6 of 2026-27 | 5,133 | 75.0% | 1.9% |
| Period 5 of 2026-27 | 5,235 | 72.7% | 2.0% |
| Period 4 of 2026-27 | 5,233 | 79.0% | 1.8% |
| Period 3 of 2026-27 | 5,199 | 71.8% | 2.9% |
| Period 2 of 2026-27 | 4,916 | 75.5% | 2.7% |
| Period 1 of 2026-27 | 5,737 | 86.1% | 1.2% |
| Period 13 of 2025-26 | 5,523 | 82.3% | 2.0% |
| Period 12 of 2025-26 | 5,081 | 84.2% | 0.8% |
| Period 11 of 2025-26 | 4,957 | 82.4% | 1.4% |
| Period 10 of 2025-26 | 4,121 | 78.2% | 0.8% |
| Period 9 of 2025-26 | 4,945 | 69.9% | 1.3% |
| Period 8 of 2025-26 | 4,860 | 72.0% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Rochester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,128 | 80.5% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out