Ridgmont
RIDEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Ridgmont has usable figures for 2 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,299 scheduled stops, about 28 a day. In those periods 93.3% of stops arrived within three minutes of the timetable and 7.4% of scheduled stops were cancelled.
Ridgmont opened on 18 November 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ridgmont is the oldest; the next oldest, Lidlington, dates from 1846.
The nearest stations to Ridgmont are Aspley Guise (2.7 km west), Lidlington (3.0 km north-east), Woburn Sands (4.2 km west), Millbrook (Bedfordshire) (5.3 km north-east) and Stewartby (6.9 km north-east). 10 stations lie within 10 km in all. Of the five, Lidlington is the most punctual at 93.9% and Stewartby the least at 92.5%, with Ridgmont on 93.3%.
Ridgmont takes its name from a Village called Ridgmont, home to about 438 people, and the station stands 1.7 km from its centre.
Across the whole run of data, the weakest four-week period for Ridgmont was Period 8 of 2024-25, at 85.4%, some time before the latest year. The strongest was Period 9 of 2025-26, at 95.6%, and the two are 10.2 percentage points apart. Cancellations peaked at 18.7% of scheduled stops in Period 5 of 2026-27, against 7.4% over the latest 13 periods.
West Midlands Railway is the only operator serving Ridgmont. Here it manages 93.3% within three minutes, 12.2 percentage points better than its 81.1% across its whole network.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 10,299 | 93.3% | 7.4% |
Operators with their own page for this station are linked to it.
Late train at Ridgmont? Delay Repay
These operators call at Ridgmont and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | – | 3.4% |
| Period 6 of 2026-27 | 759 | – | 17.1% |
| Period 5 of 2026-27 | 690 | – | 18.7% |
| Period 4 of 2026-27 | 708 | – | 9.6% |
| Period 3 of 2026-27 | 816 | 90.9% | 8.7% |
| Period 2 of 2026-27 | 748 | – | 5.5% |
| Period 1 of 2026-27 | 918 | – | 10.0% |
| Period 13 of 2025-26 | 884 | – | 4.1% |
| Period 12 of 2025-26 | 816 | – | 3.1% |
| Period 11 of 2025-26 | 816 | – | 3.8% |
| Period 10 of 2025-26 | 696 | – | 3.9% |
| Period 9 of 2025-26 | 816 | 95.6% | 5.0% |
| Period 8 of 2025-26 | 816 | – | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out