GTR at Reigate
How this operator is doing here
GTR had 23,223 scheduled stops at Reigate in the 13 periods to Period 7 of 2026-27, 49% of the station's total. 86.5% of recorded arrivals came within three minutes and 5.2% of stops were cancelled.
GTR trains at Reigate also serve Redhill (2.6 km east, 78.6% on time, 5.4% cancelled), Earlswood (Surrey) (2.7 km south-east, 76.2% on time, 8.5% cancelled), Merstham (4.5 km north-east, 80.8% on time, 5.1% cancelled), Nutfield (5.2 km east, 82.5% on time, 1.5% cancelled), Salfords (Surrey) (5.3 km south-east, 77.4% on time, 8.5% cancelled) and Kingswood (5.9 km north, 84.4% on time, 2.9% cancelled), which are the stations on its network closest to Reigate.
Within 30 km of here, GTR runs best at Birkbeck, 20.7 km north-east (98.1%), and worst at Kenley, 11.6 km north-east (66.9%).
The busiest GTR station within 30 km of Reigate is East Croydon, 16.8 km north-east, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Reigate, GTR is the most punctual, at 86.5%.
GTR at Reigate has slipped a little, from 89.1% within three minutes in the previous 13 periods to 86.5% in the latest 13, a fall of 2.6 percentage points. Cancellations rose to 5.2% of scheduled stops from 3.5%, which is 1.7 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,801 | 84.1% | 6.8% |
| Period 6 of 2026-27 | 1,762 | 83.0% | 3.1% |
| Period 5 of 2026-27 | 1,808 | 80.0% | 6.2% |
| Period 4 of 2026-27 | 1,800 | 86.5% | 7.6% |
| Period 3 of 2026-27 | 1,688 | 84.0% | 5.5% |
| Period 2 of 2026-27 | 1,807 | 91.1% | 3.9% |
| Period 1 of 2026-27 | 2,087 | 92.4% | 2.1% |
| Period 13 of 2025-26 | 1,955 | 92.8% | 3.9% |
| Period 12 of 2025-26 | 1,813 | 86.7% | 3.1% |
| Period 11 of 2025-26 | 1,515 | 81.7% | 3.9% |
| Period 10 of 2025-26 | 1,573 | 88.4% | 5.4% |
| Period 9 of 2025-26 | 1,809 | 84.2% | 7.4% |
| Period 8 of 2025-26 | 1,805 | 87.2% | 8.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Reigate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 24,608 | 77.2% | 6.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out