Reddish North
RDNNorth WestManaged by Northern Trains
How this station is performing
Reddish North had 23,501 scheduled stops to Period 7 of 2026-27, about 65 a day. 85.3% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Reddish North opened on 1 December 1875, 151 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Gorton is the oldest (1842) and Ryder Brow the newest (1985), with Reddish North in between.
The nearest stations to Reddish North are Ryder Brow (1.4 km north-west), Reddish South (1.5 km south), Denton (1.9 km north-east), Belle Vue (2.0 km north-west) and Gorton (2.2 km north). 43 stations lie within 10 km in all. At 85.3%, Reddish North is less punctual than all of them; the best of the five, Ryder Brow, manages 92.5%.
Reddish North is named after Reddish, a suburb, home to about 28,052 people, but the station stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Reddish North was Period 9 of 2023-24, at 70.2%, some time before the latest year. The strongest was Period 1 of 2024-25, at 94.8%, and the two are 24.6 percentage points apart. Cancellations peaked at 19.1% of scheduled stops in Period 10 of 2024-25, against 2.8% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Reddish North on 85.3%. The comparison group includes Bredbury (86.2%), Brinnington (86.8%) and Lostock (58.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,501 | 85.3% | 2.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,856 | 83.4% | 4.3% |
| Period 6 of 2026-27 | 1,844 | 86.4% | 1.1% |
| Period 5 of 2026-27 | 1,844 | 81.7% | 2.3% |
| Period 4 of 2026-27 | 1,855 | 84.1% | 2.0% |
| Period 3 of 2026-27 | 1,664 | 83.0% | 1.6% |
| Period 2 of 2026-27 | 1,838 | 84.0% | 4.3% |
| Period 1 of 2026-27 | 2,137 | 86.6% | 3.6% |
| Period 13 of 2025-26 | 1,996 | 91.9% | 1.0% |
| Period 12 of 2025-26 | 1,291 | 88.8% | 1.2% |
| Period 11 of 2025-26 | 1,815 | 91.1% | 1.9% |
| Period 10 of 2025-26 | 1,673 | 85.9% | 6.2% |
| Period 9 of 2025-26 | 1,832 | 80.2% | 4.3% |
| Period 8 of 2025-26 | 1,856 | 82.5% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bredbury | 23,501 | 86.2% | 2.8% |
| Brinnington | 23,501 | 86.8% | 2.8% |
| Lostock | 23,466 | 58.4% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out