Bredbury
BDYNorth WestManaged by Northern Trains
How this station is performing
Bredbury had 23,501 scheduled stops to Period 7 of 2026-27, about 65 a day. 86.2% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Bredbury opened on 1 September 1875, 151 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hyde Central is the oldest (1858) and Brinnington the newest (1977), with Bredbury in between.
The nearest stations to Bredbury are Woodley (1.3 km north-east), Romiley (1.7 km south-east), Brinnington (1.9 km north-west), Reddish South (3.6 km north-west) and Hyde Central (3.6 km north-east). 44 stations lie within 10 km in all. At 86.2%, Bredbury is less punctual than all of them; the best of the five, Woodley, manages 92.3%.
Bredbury takes its name from a Village called Bredbury, home to about 17,040 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Bredbury was Period 9 of 2023-24, at 72.8%, some time before the latest year. The strongest was Period 1 of 2024-25, at 95.0%, and the two are 22.2 percentage points apart. Cancellations peaked at 19.3% of scheduled stops in Period 10 of 2024-25, against 2.8% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Bredbury on 86.2%. The comparison group includes Brinnington (86.8%), Reddish North (85.3%) and Lostock (58.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,501 | 86.2% | 2.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,856 | 84.9% | 4.4% |
| Period 6 of 2026-27 | 1,844 | 87.1% | 1.0% |
| Period 5 of 2026-27 | 1,844 | 82.0% | 2.3% |
| Period 4 of 2026-27 | 1,855 | 83.9% | 2.0% |
| Period 3 of 2026-27 | 1,664 | 83.0% | 1.6% |
| Period 2 of 2026-27 | 1,838 | 85.6% | 4.3% |
| Period 1 of 2026-27 | 2,137 | 88.4% | 3.6% |
| Period 13 of 2025-26 | 1,996 | 92.3% | 1.0% |
| Period 12 of 2025-26 | 1,291 | 89.0% | 1.2% |
| Period 11 of 2025-26 | 1,815 | 91.9% | 1.9% |
| Period 10 of 2025-26 | 1,673 | 87.3% | 6.2% |
| Period 9 of 2025-26 | 1,832 | 81.2% | 4.3% |
| Period 8 of 2025-26 | 1,856 | 83.2% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brinnington | 23,501 | 86.8% | 2.8% |
| Reddish North | 23,501 | 85.3% | 2.8% |
| Lostock | 23,466 | 58.4% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out