TransPennine Express at Redcar Central
All trains at Redcar CentralTransPennine Express across BritainNorth East
How this operator is doing here
TransPennine Express had 11,848 scheduled stops at Redcar Central in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 73.8% of recorded arrivals came within three minutes and 10.7% of stops were cancelled.
TransPennine Express trains at Redcar Central also serve Saltburn (7.1 km south-east, 70.1% on time, 9.9% cancelled), Middlesbrough (11.3 km west, 72.8% on time, 6.2% cancelled), Thornaby (16.2 km south-west, 70.2% on time, 2.1% cancelled), Eaglescliffe (20.4 km south-west, 68.1% on time, 1.8% cancelled), Yarm (22.7 km south-west, 61.4% on time, 1.7% cancelled) and Darlington (32.5 km west, 74.7% on time, 3.3% cancelled), which are the stations on its network closest to Redcar Central.
Within 30 km of here, TransPennine Express runs best at Middlesbrough, 11.3 km west (72.8%), and worst at Yarm, 22.7 km south-west (61.4%).
The busiest TransPennine Express station within 30 km of Redcar Central is Middlesbrough, 11.3 km west, with about 33 scheduled stops a day.
TransPennine Express at Redcar Central improved sharply over the past year. In the latest 13 periods 73.8% of stops came within three minutes of the timetable, up 5.6 percentage points from 68.2% in the 13 before. Cancellations rose to 10.7% of scheduled stops from 7.1%, which is 3.6 percentage points more.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 914 | 67.1% | 14.2% |
| Period 6 of 2026-27 | 940 | 74.3% | 10.1% |
| Period 5 of 2026-27 | 951 | 72.5% | 13.2% |
| Period 4 of 2026-27 | 947 | 70.1% | 11.3% |
| Period 3 of 2026-27 | 952 | 89.8% | 5.5% |
| Period 2 of 2026-27 | 786 | 68.2% | 21.4% |
| Period 1 of 2026-27 | 1,045 | 77.5% | 7.6% |
| Period 13 of 2025-26 | 892 | 77.5% | 8.3% |
| Period 12 of 2025-26 | 952 | 78.2% | 7.1% |
| Period 11 of 2025-26 | 889 | 85.2% | 8.9% |
| Period 10 of 2025-26 | 871 | 76.0% | 5.1% |
| Period 9 of 2025-26 | 920 | 56.2% | 13.7% |
| Period 8 of 2025-26 | 789 | 59.1% | 14.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Redcar Central
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 22,353 | 88.1% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out