Elizabeth line at Reading
All trains at ReadingElizabeth line across BritainSouth East
How this operator is doing here
Elizabeth line had 32,520 scheduled stops at Reading in the 13 periods to Period 7 of 2026-27, 12% of the station's total. 84.3% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
Elizabeth line trains at Reading also serve Twyford (7.8 km east, 82.7% on time, 4.1% cancelled), Maidenhead (18.5 km east, 84.7% on time, 4.0% cancelled), Taplow (21.4 km east, 83.1% on time, 3.7% cancelled), Burnham (Buckinghamshire) (23.6 km east, 85.9% on time, 4.4% cancelled), Slough (27.0 km east, 84.3% on time, 3.9% cancelled) and Langley (Berks) (30.4 km east, 84.7% on time, 4.1% cancelled), which are the stations on its network closest to Reading.
Within 30 km of here, Elizabeth line runs best at Burnham (Buckinghamshire), 23.6 km east (85.9%), and worst at Twyford, 7.8 km east (82.7%).
The busiest Elizabeth line station within 30 km of Reading is Maidenhead, 18.5 km east, with about 144 scheduled stops a day.
Elizabeth line ranks 2nd of the 4 operators with enough records at Reading, on 84.3%.
For Elizabeth line, Reading is the 35th best of 41 ranked stations. Its 84.3% here is 5.3 percentage points below the 89.6% across the whole network.
Cancellations of Elizabeth line at Reading are near its usual level: 3.7% of scheduled stops, against 3.1% across its network and 3.7% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,502 | 86.8% | 3.9% |
| Period 6 of 2026-27 | 2,359 | 83.7% | 4.2% |
| Period 5 of 2026-27 | 2,506 | 82.1% | 5.6% |
| Period 4 of 2026-27 | 2,498 | 86.7% | 1.4% |
| Period 3 of 2026-27 | 2,436 | 86.7% | 4.6% |
| Period 2 of 2026-27 | 2,452 | 86.3% | 2.2% |
| Period 1 of 2026-27 | 2,819 | 85.1% | 4.5% |
| Period 13 of 2025-26 | 2,759 | 86.4% | 2.5% |
| Period 12 of 2025-26 | 2,504 | 84.6% | 2.8% |
| Period 11 of 2025-26 | 2,506 | 83.7% | 5.1% |
| Period 10 of 2025-26 | 2,172 | 82.1% | 2.9% |
| Period 9 of 2025-26 | 2,503 | 80.0% | 3.2% |
| Period 8 of 2025-26 | 2,504 | 81.1% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Reading
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 198,822 | 72.2% | 3.7% |
| South Western Railway | 27,544 | 87.9% | 2.1% |
| CrossCountry | 16,911 | 60.3% | 5.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out