Ramsgreave and Wilpshire
RGWNorth WestManaged by Northern Trains
How this station is performing
Ramsgreave and Wilpshire has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,007 scheduled stops, about 33 a day. In those periods 79.2% of stops arrived within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Ramsgreave and Wilpshire opened on 22 June 1850 and closed to passengers on 10 September 1962. It reopened on 29 May 1994, 32 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Ramsgreave and Wilpshire is the newest; the oldest, Blackburn, opened in 1846.
The nearest stations to Ramsgreave and Wilpshire are Langho (3.4 km north-east), Blackburn (3.7 km south), Rishton (4.2 km south-east), Mill Hill (Lancs) (5.2 km south) and Cherry Tree (5.9 km south-west). 11 stations lie within 10 km in all. Of the five, Mill Hill (Lancs) is the most punctual at 84.9% and Blackburn the least at 76.0%, with Ramsgreave and Wilpshire on 79.2%.
Ramsgreave and Wilpshire is named after Ramsgreave, a settlement, home to about 784 people, but the station stands 1.7 km from its centre.
Compared with 3 stations of a similar size in North West, Ramsgreave and Wilpshire is the least punctual, at 79.2%. All of them are ahead, including Langho (82.1%), Whalley (Lancashire) (82.7%) and Clitheroe (86.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,007 | 79.2% | 4.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 924 | 76.5% | 4.4% |
| Period 6 of 2026-27 | 922 | 82.4% | 3.4% |
| Period 5 of 2026-27 | 920 | 83.6% | 5.1% |
| Period 4 of 2026-27 | 921 | 78.8% | 3.6% |
| Period 3 of 2026-27 | 910 | 81.1% | 4.2% |
| Period 2 of 2026-27 | 916 | 79.7% | 4.1% |
| Period 1 of 2026-27 | 1,080 | – | 4.1% |
| Period 13 of 2025-26 | 996 | 83.8% | 2.6% |
| Period 12 of 2025-26 | 916 | 80.6% | 2.1% |
| Period 11 of 2025-26 | 919 | 78.0% | 3.3% |
| Period 10 of 2025-26 | 835 | 83.2% | 8.3% |
| Period 9 of 2025-26 | 912 | 70.1% | 4.9% |
| Period 8 of 2025-26 | 836 | 72.9% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Langho | 12,007 | 82.1% | 4.2% |
| Whalley (Lancashire) | 12,007 | 82.7% | 4.0% |
| Clitheroe | 12,008 | 86.0% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out