Langho
LHONorth WestManaged by Northern Trains
How this station is performing
Langho has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,007 scheduled stops, about 33 a day. In those periods 82.1% of stops arrived within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Langho opened on 22 June 1850 and closed to passengers on 7 May 1956. It reopened on 29 May 1994, 32 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Langho is the newest; the oldest, Blackburn, opened in 1846.
The nearest stations to Langho are Whalley (Lancashire) (3.2 km north-east), Ramsgreave and Wilpshire (3.4 km south-west), Rishton (4.9 km south), Blackburn (6.8 km south) and Church and Oswaldtwistle (7.1 km south-east). 11 stations lie within 10 km in all. Of the five, Whalley (Lancashire) is the most punctual at 82.7% and Blackburn the least at 76.0%, with Langho on 82.1%.
Langho is one of 2 stations named after a Village called Langho; this one stands 0.0 km from its centre.
2 of 3 stations of a similar size in North West are more punctual than Langho on 82.1%. The comparison group includes Ramsgreave and Wilpshire (79.2%), Whalley (Lancashire) (82.7%) and Clitheroe (86.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,007 | 82.1% | 4.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 924 | 79.9% | 4.4% |
| Period 6 of 2026-27 | 922 | 85.1% | 5.7% |
| Period 5 of 2026-27 | 920 | 85.3% | 5.1% |
| Period 4 of 2026-27 | 921 | 81.9% | 3.6% |
| Period 3 of 2026-27 | 910 | 84.6% | 4.2% |
| Period 2 of 2026-27 | 916 | 83.0% | 4.1% |
| Period 1 of 2026-27 | 1,080 | – | 4.1% |
| Period 13 of 2025-26 | 996 | 86.1% | 2.6% |
| Period 12 of 2025-26 | 916 | 82.6% | 2.1% |
| Period 11 of 2025-26 | 919 | 82.6% | 3.3% |
| Period 10 of 2025-26 | 835 | 85.4% | 8.3% |
| Period 9 of 2025-26 | 912 | 73.0% | 4.9% |
| Period 8 of 2025-26 | 836 | 76.2% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ramsgreave and Wilpshire | 12,007 | 79.2% | 4.0% |
| Whalley (Lancashire) | 12,007 | 82.7% | 4.0% |
| Clitheroe | 12,008 | 86.0% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out