How this operator is doing here
Southeastern had 50,180 scheduled stops at Rainham (Kent) in the 13 periods to Period 7 of 2026-27, 68% of the station's total. 74.0% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Southeastern trains at Rainham (Kent) also serve Newington (4.1 km east, 69.0% on time, 1.7% cancelled), Gillingham (Kent) (4.8 km north-west, 77.4% on time, 1.4% cancelled), Chatham (6.5 km west, 77.2% on time, 1.8% cancelled), Rochester (7.7 km west, 77.4% on time, 1.7% cancelled), Strood (Kent) (8.4 km north-west, 87.8% on time, 1.6% cancelled) and Kemsley (8.6 km east, 90.2% on time, 1.8% cancelled), which are the stations on its network closest to Rainham (Kent).
Within 30 km of here, Southeastern runs best at Yalding, 20.8 km south-west (95.3%), and worst at Teynham, 14.1 km east (67.8%).
The busiest Southeastern station within 30 km of Rainham (Kent) is Dartford, 28.7 km west, with about 326 scheduled stops a day.
Of the 2 operators with enough records at Rainham (Kent), Southeastern is the least punctual, at 74.0%.
For Southeastern, Rainham (Kent) is the 158th best of 173 ranked stations. Its 74.0% here is 10.2 percentage points below the 84.2% across the whole network.
Cancellations of Southeastern at Rainham (Kent) are near its usual level: 1.7% of scheduled stops, against 1.7% across its network and 3.5% for every operator at the station.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,868 | 69.0% | 1.5% |
| Period 6 of 2026-27 | 3,948 | 71.0% | 1.7% |
| Period 5 of 2026-27 | 4,026 | 68.4% | 1.9% |
| Period 4 of 2026-27 | 4,010 | 74.6% | 1.6% |
| Period 3 of 2026-27 | 3,965 | 67.1% | 3.1% |
| Period 2 of 2026-27 | 3,676 | 71.8% | 2.6% |
| Period 1 of 2026-27 | 4,389 | 82.6% | 1.4% |
| Period 13 of 2025-26 | 4,213 | 79.8% | 2.6% |
| Period 12 of 2025-26 | 3,809 | 81.9% | 0.8% |
| Period 11 of 2025-26 | 3,708 | 79.6% | 1.2% |
| Period 10 of 2025-26 | 3,212 | 75.2% | 0.8% |
| Period 9 of 2025-26 | 3,741 | 69.0% | 1.0% |
| Period 8 of 2025-26 | 3,615 | 70.3% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Rainham (Kent)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 23,871 | 80.6% | 7.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out