Queenstown Road (Battersea)
QRBLondonManaged by South Western Railway
How this station is performing
Queenstown Road (Battersea) had 49,982 scheduled stops to Period 7 of 2026-27, about 137 a day. 89.1% of recorded arrivals were within three minutes of the timetable and 5.4% of scheduled stops were cancelled.
Queenstown Road (Battersea) opened on 1 November 1877, 149 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Queenstown Road (Battersea) is the newest; the oldest, Vauxhall, opened in 1838.
The nearest stations to Queenstown Road (Battersea) are Battersea Park (0.3 km north), Wandsworth Road (0.8 km south-east), Clapham High Street (1.4 km south-east), Vauxhall (2.0 km north-east) and Clapham Junction (2.1 km south-west). 135 stations lie within 10 km in all. Of the five, Battersea Park is the most punctual at 94.1% and Vauxhall the least at 84.2%, with Queenstown Road (Battersea) on 89.1%.
Across the whole run of data, the weakest four-week period for Queenstown Road (Battersea) was Period 9 of 2024-25, at 68.4%, some time before the latest year. The strongest was Period 13 of 2025-26, at 93.3%, and the two are 24.9 percentage points apart. Cancellations peaked at 11.8% of scheduled stops in Period 9 of 2025-26, against 5.4% over the latest 13 periods.
2 of 3 stations of a similar size in London are more punctual than Queenstown Road (Battersea) on 89.1%. The comparison group includes Stratford International (79.8%), Heathrow Terminal 4 (Rail Station Only) (91.1%) and Woodgrange Park (93.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 49,982 | 89.1% | 5.4% |
Operators with their own page for this station are linked to it.
Late train at Queenstown Road (Battersea)? Delay Repay
These operators call at Queenstown Road (Battersea) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,143 | 90.3% | 5.7% |
| Period 6 of 2026-27 | 4,126 | 89.6% | 3.3% |
| Period 5 of 2026-27 | 4,086 | 88.8% | 3.3% |
| Period 4 of 2026-27 | 4,104 | 90.7% | 6.7% |
| Period 3 of 2026-27 | 3,890 | 88.8% | 3.3% |
| Period 2 of 2026-27 | 3,703 | 88.4% | 8.4% |
| Period 1 of 2026-27 | 4,057 | 91.8% | 4.9% |
| Period 13 of 2025-26 | 4,249 | 93.3% | 2.8% |
| Period 12 of 2025-26 | 3,863 | 91.5% | 5.0% |
| Period 11 of 2025-26 | 3,566 | 91.8% | 4.1% |
| Period 10 of 2025-26 | 2,375 | 87.7% | 5.3% |
| Period 9 of 2025-26 | 3,946 | 83.0% | 11.8% |
| Period 8 of 2025-26 | 3,874 | 80.6% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stratford International | 49,905 | 79.8% | 1.9% |
| Heathrow Terminal 4 (Rail Station Only) | 49,902 | 91.1% | 5.2% |
| Woodgrange Park | 49,865 | 93.8% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out