Poynton
PYTNorth WestManaged by Northern Trains
How this station is performing
Poynton had 12,118 scheduled stops to Period 7 of 2026-27, about 33 a day. 81.8% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Poynton opened on 24 November 1845. It was moved to the site it uses now on 1 August 1887. Of the 5 stations nearest to it with a known opening date, Poynton is the oldest; the next oldest, Bramhall, dates from 1845.
The nearest stations to Poynton are Bramhall (2.1 km north-west), Hazel Grove (3.1 km north), Adlington (Cheshire) (3.4 km south), Middlewood (3.5 km east) and Woodsmoor (4.0 km north). 31 stations lie within 10 km in all. Of the five, Middlewood is the most punctual at 88.3% and Adlington (Cheshire) the least at 81.3%, with Poynton on 81.8%.
Poynton is one of 2 stations named after a town called Poynton, home to about 14,260 people; this one stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Poynton was Period 9 of 2024-25, at 70.9%, some time before the latest year. The strongest was Period 1 of 2023-24, at 89.3%, and the two are 18.4 percentage points apart. Cancellations peaked at 6.6% of scheduled stops in Period 10 of 2024-25, against 2.1% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Poynton is the most punctual, at 81.8%. The comparison group includes Adlington (Cheshire) (81.3%), Prestbury (81.7%) and Bramhall (81.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,118 | 81.8% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 920 | 83.1% | 2.1% |
| Period 6 of 2026-27 | 928 | 82.3% | 0.4% |
| Period 5 of 2026-27 | 920 | 83.1% | 0.9% |
| Period 4 of 2026-27 | 920 | 80.7% | 1.2% |
| Period 3 of 2026-27 | 927 | 82.3% | 0.5% |
| Period 2 of 2026-27 | 920 | 81.7% | 1.0% |
| Period 1 of 2026-27 | 1,070 | 83.1% | 5.1% |
| Period 13 of 2025-26 | 1,006 | 85.6% | 1.7% |
| Period 12 of 2025-26 | 908 | 85.1% | 1.5% |
| Period 11 of 2025-26 | 920 | 84.7% | 1.2% |
| Period 10 of 2025-26 | 840 | 79.9% | 4.2% |
| Period 9 of 2025-26 | 919 | 71.8% | 5.2% |
| Period 8 of 2025-26 | 920 | 78.4% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Adlington (Cheshire) | 12,118 | 81.3% | 2.1% |
| Prestbury | 12,118 | 81.7% | 2.1% |
| Bramhall | 12,119 | 81.8% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out