Adlington (Cheshire)
ADCNorth WestManaged by Northern Trains
How this station is performing
Adlington (Cheshire) had 12,118 scheduled stops to Period 7 of 2026-27, about 33 a day. 81.3% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Adlington (Cheshire) opened on 24 November 1845, 181 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Handforth is the oldest (1842) and Middlewood the newest (1879), with Adlington (Cheshire) in between.
The nearest stations to Adlington (Cheshire) are Prestbury (3.0 km south), Poynton (3.4 km north), Bramhall (4.9 km north-west), Middlewood (5.6 km north-east) and Handforth (6.1 km north-west). 21 stations lie within 10 km in all. At 81.3%, Adlington (Cheshire) is less punctual than all of them; the best of the five, Middlewood, manages 88.3%.
Adlington (Cheshire) is named after Adlington, a Village, home to about 1,253 people, but the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Adlington (Cheshire) was Period 9 of 2024-25, at 69.8%, some time before the latest year. The strongest was Period 6 of 2023-24, at 88.2%, and the two are 18.4 percentage points apart. Cancellations peaked at 6.6% of scheduled stops in Period 10 of 2024-25, against 2.1% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Adlington (Cheshire) is the least punctual, at 81.3%. All of them are ahead, including Poynton (81.8%), Prestbury (81.7%) and Bramhall (81.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,118 | 81.3% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 920 | 82.8% | 2.0% |
| Period 6 of 2026-27 | 928 | 81.4% | 0.4% |
| Period 5 of 2026-27 | 920 | 81.7% | 0.9% |
| Period 4 of 2026-27 | 920 | 79.9% | 1.2% |
| Period 3 of 2026-27 | 927 | 82.0% | 0.5% |
| Period 2 of 2026-27 | 920 | 81.4% | 1.0% |
| Period 1 of 2026-27 | 1,070 | 82.8% | 5.1% |
| Period 13 of 2025-26 | 1,006 | 85.0% | 1.7% |
| Period 12 of 2025-26 | 908 | 85.0% | 1.5% |
| Period 11 of 2025-26 | 920 | 83.6% | 1.2% |
| Period 10 of 2025-26 | 840 | 79.6% | 4.2% |
| Period 9 of 2025-26 | 919 | 72.1% | 5.2% |
| Period 8 of 2025-26 | 920 | 78.7% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out