GTR had 23,600 scheduled stops at Portsmouth Harbour in the 13 periods to Period 7 of 2026-27, 31% of the station's total. 77.2% of recorded arrivals came within three minutes and 15.5% of stops were cancelled.
GTR trains at Portsmouth Harbour also serve Portsmouth and Southsea (1.3 km east, 73.7% on time, 13.4% cancelled), Fratton (2.5 km east, 73.2% on time, 9.6% cancelled), Hilsea (5.0 km north-east, 78.6% on time, 7.1% cancelled), Cosham (5.8 km north-east, 75.5% on time, 5.7% cancelled), Portchester (5.9 km north, 79.2% on time, 5.7% cancelled) and Fareham (8.6 km north-west, 78.7% on time, 6.2% cancelled), which are the stations on its network closest to Portsmouth Harbour.
Within 30 km of here, GTR runs best at Woolston, 22.0 km north-west (84.5%), and worst at Bosham, 19.1 km east (71.6%).
The busiest GTR station within 30 km of Portsmouth Harbour is Chichester, 23.3 km east, with about 193 scheduled stops a day.
GTR at Portsmouth Harbour has slipped sharply. 77.2% of stops came within three minutes of the timetable in the latest 13 periods, 5.4 percentage points worse than the 82.6% recorded in the 13 before. Cancellations rose to 15.5% of scheduled stops from 11.4%, which is 4.1 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,788 | 71.1% | 13.8% |
| Period 6 of 2026-27 | 1,549 | 67.4% | 18.6% |
| Period 5 of 2026-27 | 1,919 | 71.1% | 24.9% |
| Period 4 of 2026-27 | 1,920 | 77.9% | 19.9% |
| Period 3 of 2026-27 | 1,830 | 77.2% | 16.7% |
| Period 2 of 2026-27 | 1,578 | 82.2% | 15.7% |
| Period 1 of 2026-27 | 1,995 | 81.5% | 10.1% |
| Period 13 of 2025-26 | 1,792 | 80.7% | 12.9% |
| Period 12 of 2025-26 | 1,788 | 77.3% | 10.1% |
| Period 11 of 2025-26 | 1,922 | 81.5% | 11.4% |
| Period 10 of 2025-26 | 1,770 | 76.0% | 15.1% |
| Period 9 of 2025-26 | 1,853 | 76.8% | 19.9% |
| Period 8 of 2025-26 | 1,896 | 80.2% | 12.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Portsmouth Harbour
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 40,565 | 73.2% | 3.5% |
| Great Western Railway | 11,235 | 63.9% | 7.7% |