Newquay
NQYSouth WestManaged by Great Western Railway
How this station is performing
Newquay had 7,479 scheduled stops to Period 7 of 2026-27, about 20 a day. 85.3% of recorded arrivals were within three minutes of the timetable and 8.9% of scheduled stops were cancelled.
Newquay opened on 20 June 1876, 150 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Truro is the oldest (1859) and Quintrell Downs the newest (1911), with Newquay in between.
The nearest stations to Newquay are Quintrell Downs (3.5 km east), St Columb Road (9.7 km east), Truro (16.7 km south), Roche (17.3 km east) and Bugle (20.1 km east). 2 stations lie within 10 km in all. At 85.3%, Newquay is more punctual than every one of them; the best of the five, Quintrell Downs, manages 79.1%.
Newquay takes its name from a town called Newquay, home to about 23,626 people, and the station stands 0.3 km from its centre.
Newquay has slipped sharply. 85.3% of stops came within three minutes of the timetable in the latest 13 periods, 5.3 percentage points worse than the 90.6% recorded in the 13 before. Cancellations rose to 8.9% of scheduled stops from 2.3%, which is 6.6 percentage points more.
Compared with 3 stations of a similar size in South West, Newquay is the most punctual, at 85.3%. The comparison group includes Pewsey (49.1%), Quintrell Downs (79.1%) and Whimple (70.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 7,479 | 85.3% | 8.9% |
Operators with their own page for this station are linked to it.
Late train at Newquay? Delay Repay
These operators call at Newquay and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 784 | 93.6% | 4.5% |
| Period 6 of 2026-27 | 866 | 90.3% | 4.6% |
| Period 5 of 2026-27 | 882 | 79.4% | 11.3% |
| Period 4 of 2026-27 | 888 | 76.2% | 15.7% |
| Period 3 of 2026-27 | 859 | 75.6% | 13.0% |
| Period 2 of 2026-27 | 648 | 82.9% | 6.8% |
| Period 1 of 2026-27 | 472 | 91.2% | 1.5% |
| Period 13 of 2025-26 | 446 | 89.5% | 1.3% |
| Period 12 of 2025-26 | 408 | 90.0% | 7.1% |
| Period 11 of 2025-26 | 269 | 91.3% | 27.5% |
| Period 10 of 2025-26 | 362 | 88.3% | 17.7% |
| Period 9 of 2025-26 | 283 | 83.5% | 3.9% |
| Period 8 of 2025-26 | 312 | 90.8% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pewsey | 7,141 | 49.1% | 4.6% |
| Quintrell Downs | 6,972 | 79.1% | 8.5% |
| Whimple | 8,141 | 70.2% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out