Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Penshurst

PHRSouth EastManaged by Govia Thameslink Railway (Southern)

On time, last 13 periods88.7%Great Britain: 83.6%
Cancelled1.4%Great Britain: 3.2%
Stops a day43Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Penshurst has usable figures for 7 of the last 13 four-week periods to Period 7 of 2026-27, covering 15,624 scheduled stops, about 43 a day. In those periods 88.7% of stops arrived within three minutes of the timetable and 1.4% of scheduled stops were cancelled.

Penshurst opened on 26 May 1842, 184 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Penshurst is the oldest; the next oldest, Tonbridge, dates from 1842.

The nearest stations to Penshurst are Leigh (Kent) (2.7 km east), Hildenborough (4.3 km north-east), Hever (5.7 km west), Cowden (Kent) (6.4 km south-west) and Tonbridge (6.8 km east). 11 stations lie within 10 km in all. At 88.7%, Penshurst is more punctual than every one of them; the best of the five, Leigh (Kent), manages 87.4%.

Penshurst takes its name from a Village called Penshurst, home to about 1,692 people, and the station stands 3.0 km from its centre.

For Penshurst, the weakest four-week period in the data is a recent one: Period 10 of 2025-26, when only 84.0% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2025-26, at 94.6%, which is 10.6 percentage points higher. Cancellations peaked at 6.1% of scheduled stops in Period 13 of 2023-24, against 1.4% over the latest 13 periods.

Period by period

80%90%100%2023-242024-252025-262026-27Period 12 of 2023-24: 88.5%Period 13 of 2023-24: 88.8%Period 2 of 2024-25: 87.8%Period 3 of 2024-25: 93.4%Period 4 of 2024-25: 90.6%Period 5 of 2024-25: 93.4%Period 6 of 2024-25: 90.2%Period 7 of 2024-25: 90.1%Period 8 of 2024-25: 86.4%Period 10 of 2024-25: 86.9%Period 11 of 2024-25: 88.1%Period 13 of 2024-25: 90.9%Period 1 of 2025-26: 92.0%Period 2 of 2025-26: 89.7%Period 3 of 2025-26: 88.3%Period 4 of 2025-26: 88.0%Period 5 of 2025-26: 94.6%Period 6 of 2025-26: 88.6%Period 7 of 2025-26: 89.1%Period 8 of 2025-26: 88.1%Period 9 of 2025-26: 85.4%Period 10 of 2025-26: 84.0%Period 1 of 2026-27: 90.2%Period 2 of 2026-27: 94.4%Period 3 of 2026-27: 91.6%Period 5 of 2026-27: 85.9%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 0.3%Period 2 of 2023-24: 0.5%Period 3 of 2023-24: 1.5%Period 4 of 2023-24: 1.0%Period 5 of 2023-24: 1.4%Period 6 of 2023-24: 0.7%Period 7 of 2023-24: 1.5%Period 8 of 2023-24: 2.7%Period 9 of 2023-24: 2.7%Period 10 of 2023-24: 3.0%Period 11 of 2023-24: 2.3%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 6.1%Period 1 of 2024-25: 0.2%Period 2 of 2024-25: 1.3%Period 3 of 2024-25: 1.2%Period 4 of 2024-25: 1.8%Period 5 of 2024-25: 1.0%Period 6 of 2024-25: 1.4%Period 7 of 2024-25: 0.9%Period 8 of 2024-25: 2.1%Period 9 of 2024-25: 5.3%Period 10 of 2024-25: 1.8%Period 11 of 2024-25: 1.9%Period 12 of 2024-25: 0.6%Period 13 of 2024-25: 1.5%Period 1 of 2025-26: 0.9%Period 2 of 2025-26: 1.3%Period 3 of 2025-26: 0.3%Period 4 of 2025-26: 1.2%Period 5 of 2025-26: 2.3%Period 6 of 2025-26: 0.6%Period 7 of 2025-26: 1.0%Period 8 of 2025-26: 1.0%Period 9 of 2025-26: 2.1%Period 10 of 2025-26: 2.7%Period 11 of 2025-26: 1.2%Period 12 of 2025-26: 0.1%Period 13 of 2025-26: 0.5%Period 1 of 2026-27: 0.7%Period 2 of 2026-27: 0.5%Period 3 of 2026-27: 1.3%Period 4 of 2026-27: 2.2%Period 5 of 2026-27: 3.4%Period 6 of 2026-27: 1.6%Period 7 of 2026-27: 1.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
GTR15,62488.7%1.4%

Operators with their own page for this station are linked to it.

Late train at Penshurst? Delay Repay

These operators call at Penshurst and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,196–1.6%
Period 6 of 2026-271,188–1.6%
Period 5 of 2026-271,19985.9%3.4%
Period 4 of 2026-271,240–2.2%
Period 3 of 2026-271,19991.6%1.3%
Period 2 of 2026-271,17994.4%0.5%
Period 1 of 2026-271,39990.2%0.7%
Period 13 of 2025-261,330–0.5%
Period 12 of 2025-261,232–0.1%
Period 11 of 2025-261,029–1.2%
Period 10 of 2025-2697784.0%2.7%
Period 9 of 2025-261,22085.4%2.1%
Period 8 of 2025-261,23688.1%1.0%

Time of year

75%80%85%90%95%P1: 91.0%1P2: 90.7%2P3: 91.1%3P4: 89.3%4P5: 91.3%5P6: 89.6%6P7: 89.6%7P8: 87.3%89P10: 85.5%101112P13: 89.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out