Penally
PNAWalesManaged by TfW Rail
How this station is performing
Penally has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,928 scheduled stops, about 16 a day. In those periods 73.5% of stops arrived within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Penally opened on 1 August 1863 and closed to passengers on 15 June 1964. It reopened on 28 February 1972, 54 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Penally is the oldest; the next oldest, Tenby, dates from 1863.
The nearest stations to Penally are Tenby (1.9 km north-east), Manorbier (4.9 km west), Saundersfoot (7.0 km north), Kilgetty (8.2 km north) and Lamphey (10.4 km west). 4 stations lie within 10 km in all. Of the five, Manorbier is the most punctual at 76.6% and Saundersfoot the least at 57.2%, with Penally on 73.5%.
Penally takes its name from a Village called Penally, home to about 856 people, and the station stands 0.1 km from its centre.
Compared with 3 stations of a similar size in Wales, Penally is the least punctual, at 73.5%. All of them are ahead, including Lamphey (74.4%), Manorbier (76.6%) and Pembroke (74.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,894 | 73.5% | 4.0% |
| Great Western Railway | 34 | – | – |
Operators with their own page for this station are linked to it.
Late train at Penally? Delay Repay
These operators call at Penally and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 81.0% | 3.2% |
| Period 6 of 2026-27 | 484 | 72.2% | 1.4% |
| Period 5 of 2026-27 | 474 | 67.6% | 4.9% |
| Period 4 of 2026-27 | 474 | – | 5.3% |
| Period 3 of 2026-27 | 472 | 71.2% | 3.2% |
| Period 2 of 2026-27 | 466 | 62.9% | 5.2% |
| Period 1 of 2026-27 | 531 | 71.4% | 3.2% |
| Period 13 of 2025-26 | 416 | 72.9% | 2.6% |
| Period 12 of 2025-26 | 464 | 83.6% | 1.9% |
| Period 11 of 2025-26 | 426 | 83.7% | 2.6% |
| Period 10 of 2025-26 | 419 | 72.1% | 6.0% |
| Period 9 of 2025-26 | 450 | – | 5.1% |
| Period 8 of 2025-26 | 388 | 74.1% | 9.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out